Thursday, 26 January 2012

Optimise continue to ignore regulations in Brokesley Street

Thames Water's contractors Optimise (which combines contractors Clancey Docwra and J Murphy and Sons) are currently breaching:
  • the suspension of parking in Brokesley Street which was limited to 23-24 January 2012
  • the ban on construction traffic in Brokesley Street as per the planning conditions for the development on Site 10 (1 - 14 Brokesley Street).
It's worth repeating - that says "No Construction Traffic in Brokesley Street"

Roadworks are complete - so why is the fencing still there?

Where is the parking control notice
for 25-26 January 2012?
This follows on from the post on Monday when access to the street was blocked by contractors vehciles - see Clancey Docwra block Brokesley Street to emergency vehicles

The photographs in this post were taken just before 9am this morning.

The road should be clear of all fencing - because the holes in the road were completed yesterday.  There is now no reason for fencing to be protecting the area of road they have been working on.  

The other reason the fencing should not be there is because cars are now allowed to park on the other side of the street according to the suspended parking notice!

There are works to do to the pavement but:
  • they do not require the fencing which remains and 
  • if they do - then they need to apply for an extension of the parking suspension
The road should also be clear of all construction and contractors vehicles - as per the planning conditions - but it is not.  
  • There is a lorry parked at the top of the street 
  • an Elm Surfacing Van (Transit Connect - Vehicle Reg. HK57 FLC) - which is parked within the "suspended parking area".  Which means it's definitely breaching parking controls as it has neither a permit if the parking is not suspended and it's parked in an area of suspended parking (ie required for access in and out of the street) if the controls are still in force.
Our understanding is that the suspended parking bays are not suspended unless there is a clear notice and the area is marked on the pavement.

Elm Surfacing Van Reg. No HK47 FLC
reported to parking control and TfL
Brokesley Street has had a series of suspended parking bays - ostensibly for works - when nobody has turned up and nothing has happened.

We now have work occurring which ignores both the planning conditions and the parking controls.  This is completely unsatisfactory.

Luke, the Telford Homes Project Manager, knows all about this as he was present on site this morning when we arrived to take photographs.  He disappeared very rapidly from the scene as the camera appeared.  We wonder why.........

Reports of the very poor management of these utility/road works by Thames Water, Optimise and Telford Homes are being lodged by MERA with:
You can also send in your own reports.

UPDATE: Click on image to read report filed 10am on 26 January 2012

MERA will also be sending emails again to the London Borough of Tower Hamlets (Parking Control and Development Control)

This is the standard which Thames Water SHOULD be working to - over and above the requirements re planning conditions and parking controls.  

The Mayor of London's Roadworks Pledge

Roadworks should...
  • Be tidy and safe with a clutter-free site so it is safe for pedestrians, cyclists and other road users
  • Always explain what's happening through detailed, clear and consistent signage
  • Always have activity on site or, if not, explain why (e.g. concrete is drying)
  • Take up as little road/pavement space as possiblewith a compact working area and eliminating the unnecessary use of cones, safety barriers and storage of materials
  • Help keep London moving by working outside peak hours, re-opening the road to traffic at peak times and, where this is not possible, working 24/7 or extended hours to complete works as quickly as possible. Diversion routes should be clearly signed


Monday, 23 January 2012

Clancey Docwra block Brokesley Street to emergency vehicles

ClanceyDocra are ignoring requirements to maintain 24/7 access for emergency vehicles into Brokesley Street by repeatedly blocking it with their vehicles during works to Site 10.

JCB blocks access of emergency vehicles to
Brokesley Street 23 January 2012

(right click image to see a larger version)
One of the conditions of the planning permission for the Eric/Treby Street Regeneration project was that there should be NO CONSTRUCTION VEHICLES in Brokesley Street due to the difficulties this presents for access by residents and, more importantly, to the 24/7 access required by emergency vehicles

Parking has been suspended at the top end of Brokesley Street over a number of days recently due to the need for water works relating to the new development on Site 10

In other words these are utility works which are directly related to the construction of the houses on Site 10 - 1-14 Brokesley Street

The suspension of parking was to allow vehicles to pass up and down the road as part of the road was cordoned off to allow works to drains.

The suspension of parking does NOT permit the road to be blocked by construction or utility companies.

Two separate incidents were witnessed within a period of 30 minutes at lunchtime on 23 January 2012 by a MERA Committee Member.

Firstly a truck was parked in the road - completely blocking the road - while it removed material. The line of the driver was that he could move at any time.  He ignores how long it takes him to get out of a street where he has to reverse up the street and into a main road to allow access by a fire engine or an ambulance.  There is no reason why a very large truck was required to remove the material.  A much smaller vehicle could have been used as has occurred elsewhere on the other regeneration sites which are part of this development.

Clancey Docwra Block access to emergency services
and local residents of Brokesley Street
Next a JCB set up - and became immobile - while it helped dig a trench.  This effectively blocked the road to emergency vehicles or local residents needing to leave their homes by car.  Hence photographs were taken.

The trench did not need to be dug by a JCB.  Trenches are dug all the time all over London without the use of a JCB.

This vehicle is being reported to Tower Hamlets Street Services
for blocking Brokesley Street on 23 January 2012
This vehicle and this infringement of the planning permission will now be reported to Parking Services and Decelopment Control respectively.