Demolition out of control at Linden Homes St Clements site?



This is a perfectly sound tree which has just been felled by people working on the Linden Homes St Clements Development.  The workforce on site at the moment are employed by Squibb Demolition Contractors.

The trees on the site are all protected by the fact that the site lies within the Cemetary Park Conservation Zone.
  • Consequently all tree lopping and felling is subject to a planning application to Tower Hamlets Council.  
  • The last planning application was PA/09/01069 which related to several trees on the site - but not this one. This planning application has been removed from the planning database.
Following the removal of the tree, an email was sent to the Planning Department and a response was received
Thank you for your email which has been forwarded on to our planning enforcement team to investigate.
A detailed letter has now been sent to Tower Hamlets Planning Department - and copied to the local councillors - with respect to the failure to enforce planning applications and conditions on this site.

This highlights how a number of actions have been taking place on the site IN ADVANCE OF THE PROPER DISCHARGE OF PLANNING CONDITIONS.  This includes consultation with all near neighbours and Mile End Residents Association.

The local Councillors for Mile End are Shah Alam (Tower Hamlets First); David Edgar (Labour)  and Rachael Saunders (Labour).



Saturday, 28 January 2012

A prompt response from Tower Hamlets Street Works

MERA has had two responses to the blog posts and emails sent to various council officers, councillors and Optimise
  • On Friday, MERA received an email and photos (see below) from a Tower Hamlets Street Works Officer following the despatch of emails to various parties within LB Tower Hamlets
  • On Thursday we got an acknowledgement of our email from Optimise - but no proper response to date.
We're grateful for the prompt response -  but have some issues we still want to pursue.  Read the Street Works email and our comments below.

Brokesley Street 16.45pm (after the contractors had gone home)
- the work is still not complete,
the road has not been cleaned to remove soil debris as required by the planning conditions
Street Works photo
Footpath Closed - but does this have a current permit?
Street Works Photo 26 January 2012

Hello Mile End Residents, following the receipt of your concerns and complaints yesterday I visited Brokesley St and took the attached photos.

These are TW-Optimise works - being undertaken by the section known as 'Developer Services', carried out by a Statutory Undertaker under the terms and conditions of NRSWA - New Roads and Streetworks Act.

As a Statutory Undertaker TW have the right to place and maintain apparatus within the Highway - and under their governing body, OFWAT, have the duty to maintain this supply, and also the duty to respond to a reasonable request for a supply connection.

These works are however monitored generally by the Highways Authority and subject to the Codes of Practise. These codes require the Undertaker to Notice these works, carry them out to a standard of reinstatement and again generally to complete works without undue delay, minimise disruption to road users, and where the access to a frontage is affected to allow for consultation before works start, (unless works are deemed to be 'Emergency' or 'Urgent').

Following discussion with Optimise personnel I understand these works were to have been carried out without closing the road formally and best maintain access for residents by suspending Parking Bays. To minimise the time on site the JCB 'Digger' was used where possible, the gang being aware of the need to maintain Emergency Service access at all times and able to move this vehicle if required.

It does appear that works were carried out after the formal Bay Suspensions were removed and this is a matter that will be discussed with Optimise to establish what went wrong here and how they propose to avoid a repeat in future.

We will continue to be aware of these works and the potential to cause concern to residents and the works will be monitored for any failing with regard to the specification following reinstatement.

Please let me know if you have any comments, and if you have further concerns regarding future Statutory Undertakers works in Brokesley St do not hesitate to contact the Streetworks section - if you can attach photos it does help, thanks, regards, CNH.

Charlie Harrison
Street Works Officer
CLC Streetworks
London Borough of Tower Hamlets
e-mail charlie.harrison@towerhamlets.gov.uk

The officer does not address:
  • the planning conditions relating to no access/no parking allowed by vehicles associated with construction (as these are - even if they are a utility company)
  • the parking of vehicles on double yellow lines as indicated in previous posts (which as the Council's own policy highlights cannot be suspended)
  • the parking of vehicles within suspended parking bays - not allowed as per the Council's own policy (ie the bays were suspended for access not for use by vehicles working on site)
  • the lack of consultation with residents about how the works were to be conducted and the potential for the road to be completely obstructed 
  • the inconvenience caused to residents by works taking place AFTER the parking bay suspension finished.  He recognises that requires further enquiry.
The Works are not Complete - but have no completion date
No permit number displayed re pavement closure
How does this comply with the Code of Practice? 
Compare to photo (below) of sign as at 26 January 2012 8.47am 
(Street works photo)
Optimise Notice photographed 26 January 2012 8.47am
Stated Completion date 27 January 2012
Permit Number 74YSYF
In addition three more matters not previously raised will also be pursued 
  1. the fact that the Optimise Notice now has no permit number and no completion date despite the fact the pavement is still closed (which was not the case prior to the works)
  2. the absence of any Notice of the Council order to close the pavement (Should it be closed at all?  When will it be open again?)
  3. the failure to mark the Optimise road works in the manner as required by the planning permission / Code of Practice (no lights at night earlier in the week when they were in the road, fences fell over on a regular basis)
We're also still wondering why none of the irregularities in relation to parking bay suspensions and parking on double yellow lines got picked up by the parking wardens.


We'll be corresponding further to ensure there are no further repercussions of this serious disregard of the interests of local residents and the contractor's breaches of the law and the Council's own policy on parking suspensions.

To date MERA has not received any acknowledgement or reply from any of the Ward Councillors or Development Control.

DO PLEASE TAKE PHOTOS / EMAIL TO MERA
IF YOU SEE ANY OTHER WORKS CAUSING PROBLEMS FOR LOCAL RESIDENTS


Friday, 27 January 2012

Suspension of Parking in Tower Hamlets - Policy and Rules

Highway Maintenance - parked on yellow lines
following several days of water works in 

Brokesley Street 26 January 2012
(There is no notice of suspension and no dispensation in force
and planning conditions prevent access by construction vehicles)

MERA has been looking up Tower Hamlet Council's Policy on Parking and Traffic Enforcement.

For the benefit of residents in the Mile End Area and all those who seek suspensions of parking bays we've reproduced the section relevant to the suspension of parking bays in this blog post.  (It starts on page 40 of the document which you can access by clicking this link)

We've highlighted the parts of most interest to local residents.
__________________________________________
This section reviews -
  • The exemptions included in the Council's Traffic Management Orders (parking and moving traffic)
  • The availability of dispensations from the waiting and loading restrictions
  • The ability to suspend certain parking regulations
Suspensions, dispensations and exemptions all seem very similar, but in parking they have quite specific meanings and uses, not only in relation to CPZs but more generally (and they are not the same as permits, which are explained in Section 5)
Suspensions


Having introduced (or "designated") a permitted parking place (permit holder, shared use, pay and display, doctor, disabled, etc.), it may be necessary to suspend it for a short time. (If the parking place is no longer required, or it is deemed that it would be better utilised for another purpose, it should be revoked. A Traffic Management Order is required to revoke a designated parking place).

Unless there are exceptional circumstances, the Council will only suspend a designated parking place in the following circumstances:-
a) to facilitate maintenance and repairs to the highway
b) to facilitate maintenance and repairs to services (gas, water,
electric, telecoms etc.) buried within the highway
c) business or domestic removal
d) building works
e) filming
f) at the request of the Police (events and public safety)
Anyone can request the suspension of a parking place (or part of a parking place), provided it is for one of the reasons stated above. The suspension is provided to help carry out a task or event but clearly causes inconvenience to those motorists who are then not permitted to use the parking place; and in extreme circumstances a long-term suspension (for example, to facilitate a major redevelopment) can impact on the viability of a small business.
To minimise the inconvenience caused by suspensions the Council will:-
a) only grant a suspension when absolutely necessary
b) restrict the suspension to the minimum space required to perform the task or carry out the event
c) restrict the duration of the suspension to the shortest possible amount of time ) consider the size of suspension in conjunction with the duration (i.e. a long term suspension is more acceptable if only a short
length of kerb is taken)
e) normally make a charge for each suspension based on number of bays/number of days plus administration charge, to encourage the speedy return of the parking place to its designated use. (These charges are reviewed annually and a “parking bay” is defined as 6 metres in length)
f) where there is a choice (and usually there is not), choose to suspend "pay and display only" bays rather than "permit holder only" or "shared use" bays
g) ensure that suspensions are correctly and clearly signed
h) monitor suspensions to ensure they are removed when no longer required
Generally, no more than ten car parking spaces will be approved per day for a suspension.
For a domestic removal a total of three car spaces only will be suspended (approximately 18 metres) and there is no charge for this type of suspension. If the applicant considers this to be insufficient space, additional space may be agreed and the normal suspension charges will apply.
Applications for suspensions should be made no later than five days in advance as the Council will give at least three days advance notice of the suspension for the benefit of residents in the area. However, this is not always possible as emergencies will require priority suspensions and the Council will be unable to give advance warning. Residents are advised to check that there are no suspensions in place on a daily basis if they are leaving their car in a permit or multi use bay.
All documents supplied to holders of permits issued by the Council will include advice to the holders of the need to check their vehicle every day and to ask a neighbour, friend or relative to do this for them if they go away for any length of time, leaving their car in a designated on-street parking bay (that might have to be suspended). All designated parking bays in the Borough might be suspended at some time.

Enforcement action will be taken against any unauthorised vehicle parked in a suspended bay, even if it is displaying a resident permit. Some residents believe that if a bay has been suspended for their use, to facilitate a house removal for example, they may park their own vehicle in the bay if it is not being used by the removal vehicle. This is not the case as a suspension is authorised for a specific purpose and may only be used by the vehicle engaged in that purpose.
Any vehicle parked in a suspended parking place will be issued with a Penalty Charge Notice (PCN) and authorised for removal to the Council's car pound. Removal is appropriate because the parking bay is required for another use during the period it is suspended
It is also important to note that a suspension is actually in force at any time, even if the bay would normally be in force during a shorter period. Where times are specified on the suspension notice this will not be the case, but if there are no times shown, enforcement action may be taken at any time during a 24 hour period.
A vehicle displaying a disabled person's parking exemption, parked in a suspended parking place, will be ticketed (PCN) and relocated to the nearest safe parking place.
There are occasions when suspensions are introduced without warning (usually urgent repairs to underground services). Any vehicle that is illegally parked in the bay at the time the suspension comes into effect will be ticketed and removed to the car pound. Any legally parked vehicle will also be ticketed (this creates a unique reference number for the enforcement action) and whenever possible be relocated. The Penalty Charge Notice will be subsequently cancelled.
Where a suspension is required for such a considerable time that the Council must reconsider whether the parking place should be re-designated (as it becomes apparent that the carriageway in question is again required for the passing of vehicles), it becomes inappropriate to levy a daily charge to encourage the early return of the parking bay since this is actually outside the control of the contractor/utility company.
We are committed to giving residents and other drivers as much notice of the suspension as possible, ensuring that the signs indicating that a suspension is in place are clear and give full details of the duration, location and nature of the suspension, to regular checking of suspensions and prompt removal when they are no longer required.
There are three further key points to parking suspensions:-
a) It is not possible to suspend a parking place to permit parking, e.g. the Council can suspend a parking place so that a wedding car can wait for the bride (or groom), but will not suspend a parking place so that guests can come to the celebrations after the wedding.
b) The suspension process can be open to abuse, e.g. a builder may request the suspension of a parking place to assist with delivery of materials to the site, and then use the suspended area to park his own van. Suspensions therefore need to be properly monitored and the Council will issue PCNs in these circumstances.
c) It is not possible to suspend a waiting restriction (yellow line) or waiting and loading restriction (yellow line and kerb blips). If this is what is (in effect) required, then it may be appropriate to grant a "dispensation".
Construction vehicle related to
Telford Homes Development and Thames Water Works in
Brokesley Street on 26 January 2012 (1.49pm)


Thursday, 26 January 2012

RESULT! Brokesley Street open again

Following this morning's blog post and various reports to the "powers that be" (see Optimise continue to ignore regulations in Brokesley Street), cars are now able to park again in the "suspended parking bays" at the top of Brokesley Street.

That's because the bays were NOT suspended for the 25-26 January 2012.

Brokesley Street 2pm 26 January 2012
The reality is that Thames Water - via its agent Optimise - OBSTRUCTED the street for two days without the necessary authority. 

There was no emergency which necessitated this obstruction.  These are planned works for a new housing development project - managed by Telford Homes - and as such should have been completed within the time allotted ie within the time allowed by the permits.

However the parking bays were rendered inaccessible by the fencing in the road and the works by Thames Water and its agents which took far too long to be completed.  Difficulties were caused for residents trying to get in or out of the street and delivery vans got stuck while trying to make deliveries.  Deliveries were taking place because of course there should have been no obstruction in the street!

Proper permits for suspending parking should have been in place at all times if required - but neither the developers Telford Homes nor the utility company Thames Water, nor their agenct Optimise made sure this happened.

Proper notice should also have been given to householders - but this did not happen.


Despite overhearing a contractor this morning stating that the fencing would be moved at the end of today, by midday the fencing had been moved back to the pavement - but not before it had succeeded in blocking a very large van making a delivery to the street.

We will now wait to hear from the Council what actions they will be taking for the fact that the road was obstructed without permit and construction vehicles are still parked in the street - on double yellow lines - which are not suspended!

Construction vehicle NJ57 GDF - parked on yellow lines in Brokesley Street
This vehicle has been reported to Tower Hamlets Parking and Transport for London - as will all construction vehicles which are parked in the road.  The place for parking is the Approved Access Route to Site 10 - via the old St Clements Hospital site


Optimise continue to ignore regulations in Brokesley Street

Thames Water's contractors Optimise (which combines contractors Clancey Docwra and J Murphy and Sons) are currently breaching:
  • the suspension of parking in Brokesley Street which was limited to 23-24 January 2012
  • the ban on construction traffic in Brokesley Street as per the planning conditions for the development on Site 10 (1 - 14 Brokesley Street).
It's worth repeating - that says "No Construction Traffic in Brokesley Street"

Roadworks are complete - so why is the fencing still there?

Where is the parking control notice
for 25-26 January 2012?
This follows on from the post on Monday when access to the street was blocked by contractors vehciles - see Clancey Docwra block Brokesley Street to emergency vehicles

The photographs in this post were taken just before 9am this morning.

The road should be clear of all fencing - because the holes in the road were completed yesterday.  There is now no reason for fencing to be protecting the area of road they have been working on.  

The other reason the fencing should not be there is because cars are now allowed to park on the other side of the street according to the suspended parking notice!

There are works to do to the pavement but:
  • they do not require the fencing which remains and 
  • if they do - then they need to apply for an extension of the parking suspension
The road should also be clear of all construction and contractors vehicles - as per the planning conditions - but it is not.  
  • There is a lorry parked at the top of the street 
  • an Elm Surfacing Van (Transit Connect - Vehicle Reg. HK57 FLC) - which is parked within the "suspended parking area".  Which means it's definitely breaching parking controls as it has neither a permit if the parking is not suspended and it's parked in an area of suspended parking (ie required for access in and out of the street) if the controls are still in force.
Our understanding is that the suspended parking bays are not suspended unless there is a clear notice and the area is marked on the pavement.

Elm Surfacing Van Reg. No HK47 FLC
reported to parking control and TfL
Brokesley Street has had a series of suspended parking bays - ostensibly for works - when nobody has turned up and nothing has happened.

We now have work occurring which ignores both the planning conditions and the parking controls.  This is completely unsatisfactory.

Luke, the Telford Homes Project Manager, knows all about this as he was present on site this morning when we arrived to take photographs.  He disappeared very rapidly from the scene as the camera appeared.  We wonder why.........

Reports of the very poor management of these utility/road works by Thames Water, Optimise and Telford Homes are being lodged by MERA with:
You can also send in your own reports.

UPDATE: Click on image to read report filed 10am on 26 January 2012

MERA will also be sending emails again to the London Borough of Tower Hamlets (Parking Control and Development Control)

This is the standard which Thames Water SHOULD be working to - over and above the requirements re planning conditions and parking controls.  

The Mayor of London's Roadworks Pledge

Roadworks should...
  • Be tidy and safe with a clutter-free site so it is safe for pedestrians, cyclists and other road users
  • Always explain what's happening through detailed, clear and consistent signage
  • Always have activity on site or, if not, explain why (e.g. concrete is drying)
  • Take up as little road/pavement space as possiblewith a compact working area and eliminating the unnecessary use of cones, safety barriers and storage of materials
  • Help keep London moving by working outside peak hours, re-opening the road to traffic at peak times and, where this is not possible, working 24/7 or extended hours to complete works as quickly as possible. Diversion routes should be clearly signed


Monday, 23 January 2012

Clancey Docwra block Brokesley Street to emergency vehicles

ClanceyDocra are ignoring requirements to maintain 24/7 access for emergency vehicles into Brokesley Street by repeatedly blocking it with their vehicles during works to Site 10.

JCB blocks access of emergency vehicles to
Brokesley Street 23 January 2012

(right click image to see a larger version)
One of the conditions of the planning permission for the Eric/Treby Street Regeneration project was that there should be NO CONSTRUCTION VEHICLES in Brokesley Street due to the difficulties this presents for access by residents and, more importantly, to the 24/7 access required by emergency vehicles

Parking has been suspended at the top end of Brokesley Street over a number of days recently due to the need for water works relating to the new development on Site 10

In other words these are utility works which are directly related to the construction of the houses on Site 10 - 1-14 Brokesley Street

The suspension of parking was to allow vehicles to pass up and down the road as part of the road was cordoned off to allow works to drains.

The suspension of parking does NOT permit the road to be blocked by construction or utility companies.

Two separate incidents were witnessed within a period of 30 minutes at lunchtime on 23 January 2012 by a MERA Committee Member.

Firstly a truck was parked in the road - completely blocking the road - while it removed material. The line of the driver was that he could move at any time.  He ignores how long it takes him to get out of a street where he has to reverse up the street and into a main road to allow access by a fire engine or an ambulance.  There is no reason why a very large truck was required to remove the material.  A much smaller vehicle could have been used as has occurred elsewhere on the other regeneration sites which are part of this development.

Clancey Docwra Block access to emergency services
and local residents of Brokesley Street
Next a JCB set up - and became immobile - while it helped dig a trench.  This effectively blocked the road to emergency vehicles or local residents needing to leave their homes by car.  Hence photographs were taken.

The trench did not need to be dug by a JCB.  Trenches are dug all the time all over London without the use of a JCB.

This vehicle is being reported to Tower Hamlets Street Services
for blocking Brokesley Street on 23 January 2012
This vehicle and this infringement of the planning permission will now be reported to Parking Services and Decelopment Control respectively.

Monday, 31 January 2011

Telford Homes breach planning permission at Site 1 - again!

Telford Homes have started building on Site 1 despite the fact that they have failed to complete all the pre-commencement planning conditions.

Condition 8 relating to waste management arrangements remains outstanding - of which more later.

We heard this morning that Site 1 had been withdrawn from the application submitted to date - and we're not surprised!  So, in principle, there should be no development on site except excavations of foundations whereas in reality some considerable progress has been made above ground. This is despite the fact that Telford Homes have already had a formal written warning by Owen Whalley, Tower Hamlets Lead Planning Officer,  about ignoring and breaching planning conditions in relation to The Eric & Treby development.

This morning we've sent the following images (below) to the responsible planning officer.  Telford Homes don't appear to be able to read their own plans - as well as not being able to read planning conditions.

This is a very clear breach of the plans for the approved development at Site 1.  The plan is for the rear of Site 1 (next to the old skip area) and the photo has been taken from a flat on that corner of Ennerdale House.

plan for development next to rear of Ennerdale House (next to refuse area)

actual development at the same location
bricks are ABOVE ground / broom handle gives scale
Note the broom handle lying on the ground which gives the scale of the gap left between existing building and new development.

There is no way that the proper distance between the existing building and the approved footprint for the new building has been located correctly.

So - is this yet another example of Telford Homes contravening approved planning permission as well as ignoring the terms of pre-commencement planning conditions?

We expect that Tower Hamlets Planning will be along shortly to inspect the illegal progress being made on site 1 to date.

We'll be very interested to hear what Mr Whalley has to say about this development.......


Friday, 7 January 2011

Telford Homes keeps breaching planning conditions

Telford Homes obviously have no regard for Tower Hamlet's Council's Planning Department whatsoever - or they wouldn't keep breaching planning conditions.  Either that or they don't know which day of the week it is!

Eric & Treby Redevelopment - Site 1:  
Construction commences in advance of completion of prec-mmencement planning conditions
The processes relating to the pre-commencement planning conditions for Site 1 have not yet been completed.
CONDITION 8 - Refuse and recycling: Required prior to commencement of development (with exception of site preparation works and the digging of foundations).  PA/10/00718 - Refuse and recycling for all NEW BUILD atSite 10 (Brokesley Street), site 12 (Beckley House), site 14 (Ropery/Eric Street) ONGOING  + PA/10/01921 proposal for non-material amendment to revise wording to limit to "prior to commencement of development on each new build site" + PA/10/02464  Submission of details pursuant to discharge of condition 8 (refuse/recycling)  in respect of sites 1, 4, 7 and 9  
of application dated 22/03/10, ref: PA/09/2065 (Deadline" 10th January 2011) 
Consequently there should be no works on new build sites other than demolition and the digging and completion of foundations.  Which includes starting to build above the ground - as is happening in the photograph below - taken this morning from Ennerdale House looking down at Site 1.

Does the Site Manager know what has to happen before building can commence we ask ourselves?

Maybe our local Councillors who are also Eastendhomes Board Members would like to raise a councillor's query about why the Council keeps being ignored by the Contractor appointed by the Board breaches continue to happen?

Sunday, 5 September 2010

Mile End Estate Management Board - queries, comments and complaints

Many local residents have concerns about the development of the Eric & Treby Estate and how it is going to affect them. However many people don't realise that they are able to comment direct to the Council about their concerns. 

You can object to planning proposals if it affects your life, home or amenity.  Here in Tower Hamlets (and every other local authority in the country) the democratic system puts a priority on ordinary residents having an input to important planning decisions which affect their lives.

This means everybody is entitled to comment to the Council about any planning policy or planning application which affects their lives, their property and their amenity (eg peaceful enjoyment of where you live).  
The Minister of Town and Country Planning in 1951 stated that 'anything ugly, dirty, noisy, crowded or uncomfortable may injure the interests of amenity'. Amenity is often a material consideration in planning decisions.
You can even OBJECT if you want to! Not only that but the Council INVITES us to comment if you live nearby!

You can do more than just comment on planning matters.  If you have a concern about a proposed development, you can
  • get questions about planning aspects answered by the Council's Planning Officers
  • submit an objection to a planning application direct to the Council
  • ask the Council's Planning Enforcement Team to take action about developments which deviate from what has been agreed
  • contact Highways to express your views about obstructions to the streets and pavements
  • contact Environmental Health and ask for support about aspects of developments which constitute a statutory environmental nuisance - such as noise
The important point is that you do NOT have to direct your comments to the applicant (ie EastendHomes) or any intermediary (including the Estate Management Board or MERA).   You can if you choose - but it's your choice.

However you may want to provide your feedback direct to EastendHomes........

How Mile End Estate Management Board handles feedback

This is the Resident Involvement page on the EastendHomes website.  It states
Local delivery of services, decision making and accountability are at the heart of EastendHomes approach.
However some of the Board members on EastendHomes' Mile End Management Board have criticised MERA for representing residents' views direct to the Council's Planning Department!
MERA’s direct complaints to the Planning Department should have been discussed with the Board in the first instance and DO added that MERA’s action had subsequently undermined the Board.
Minutes of Mile End Estate (Special) Board Meeting 10th June 2010 (MERA inserted the bold italics in above quote)
It seems to MERA that Board members may fail to understand the distinction between comments/objections about planning applications and complaints.

They may also not appreciate that all households have various opportunities to make representations about various matters about redevelopment contracts direct to the Council. Residents in Mile End are doing this more and more as they lose confidence in the Board's approach to handling comments and complaints promptly and effectively.

Bernie Cameron (Chair of the Mile End Estate Management Board, Vice Chair of the EastendHomes Main Board and “Resident of the Year" - whose photo is frequently in EEH publications but who is NOT seen often on the Eric & Treby Estate) has suggested we should approach the Board with any queries we have about the building works.
Too much tarmac and too little grass and permeable surfaces
means Telford Homes MUST redo this landscaping
  • The Chair of MERA raised an example of just one aspect of the current development by Telford Homes at a meeting with the Board held on 10th June. (download minutes here). 
  • To date there has been no response despite reminders.
  • However, after contacting the Council direct about exactly the same matter, MERA received a letter from Planning Enforcement in July indicating that this area of concern MUST be addressed by Telford Homes on behalf of EastendHomes as it does not form part of the permitted development.
MERA would consider approaching the Board but we have serious reservations about its speed of response and overall effectiveness.

On the whole we still need to be persuaded that the Board is very accessible, genuinely interested, will listen carefully to residents' concerns and take prompt action to address them.

MERA says....
  • comments and/or objections are NOT complaints per se and 
  • comments and/or objections do NOT have to reported to the Board first
  • some issues need to be addressed quickly - and can't wait until the next Board meeting - whenever that is....
  • if the Board doesn't sort issues out quickly then residents are left with no option but to go direct to the Council
MERA would like to know how local residents' queries, comments and complaints regarding the development proposals can properly be  dealt with by the Estate Managament Board which has.....
  • NOT met in a normal session open to residents since 22nd April 2010 as indicated on the website...
The Mile End Board meets regularly at the British Street Community Hall.
  • NOT included the latest minutes on the website - the latest are Minutes 4 March 2010
  • a POOR TRACK RECORD in involving the residents from Eric & Treby Estate in decision-making which affects their lives 
  • IGNORED very many representations about the planning application being made by tenants and leaseholders to the Council in 2009 - and FAILED to respond adequately to the concerns which were highlighted.
  • FAILED to highlight on its website how local residents can contact the Mile End Board
  • FAILED to highlight how residents can get a quick response to queries from the Board
  • FAILED to highlight to residents how they can comment to the Council on the Application for Approval of Details of Planning Conditions to residents  (unlike MERA)
  • NEVER made any comments to Planning about various matters which are an infringement of the conditions of the permitted development (unlike MERA which has been very active in this area - resulting in visits from the Planning Enforcement Team and the Health and Safety Executive and subsequent enforcement action)
  • NOT responded to queries from MERA about building works
  • several VACANT places on the Board and inactive members
  • NO EVIDENCE (in Board minutes) that the Mile End Estate Management Board has even seen - never mind signed off - the revised Construction Management Plan for the Eric & Treby Estate.  (It took MERA 30 pages to comment on all the errors and omission in the plan)
  • NO RELATIONSHIP whatsoever with the local Mile End householders who do not live in EastendHomes Properties;
  • NO EFFECTIVE COMMUNICATION with other local Mile End householders who do not live in EastendHomes Properties about their concerns.  Many have been totally ignored despite representations.
Mile End Estate Management Board also refuses to recognise MERA!  Apparently we undermine it, don't fit their structures, etc. etc.

The reality is that MERA does exist, does represent local resident's views to the Council and provides support to individuals who want to make their own independent representations.

PLUS as a direct result of writing direct to Tower Hamlets Planning and the Health and Safety Executive, MERA has secured changes which will improve the health and safety of the environment for local residents

Would we have got the same result in the same time by submitting comments direct to the Mile End Estate Management Board?

We don't think so! What do you think?

Tomorrow - find out how to make a comment. We'll highlight what you can comment on and explain how to comment or register an objection to a planning application.

KEEP UPDATED: Subscribe to MERA - Mile End Residents Association Blog by Email

Saturday, 4 September 2010

Coniston House - an UPDATE

These are the recent blog posts on MILE END RESIDENTS' NEWS about the changes to the open space in the area surrounded by Coniston House - and an update about the outcome.

Open Space development at Coniston House (Open Space 2) as at 1st July 2010
These are the previous posts about the sudden enclosure and tarmacing of open space and removal of too little soil without proper precautions being observed in relation to the soil contamination:
In response to the petition by Coniston House residents and the representations MERA made to the Council's Planning Enforcement Officers MERA received a letter from Owen Whalley Head of Planning and Building Control.  

In summary:
  • Eastend Homes says the tarmac area is temporary and will be remediated and reinstated when construction works are complete
  • Eastend Homes MUST submit an application for temporary planning permission in order for the Council to obtain local residents views and determine if the car parking arrangements are acceptable and
  • issues re dust from the contaminated soil have been referred to Environmental Health
This is the relevant extract.  Right click the image to see a larger version.

Letter from Owen Whalley, Head of Planning and Development Control 28th July 2010
This page on the Council's website is where all the applications for planning permission re. the Eric and Treby Estate can be found.  This includes all applications for approval of details relating to satisfying planning conditions.

You can also check the latest status of all planning applications on our Redevelopment Page which tells you what is permited, what has been refused and what is "in progress" plus deadlines for all comments .


Tuesday, 31 August 2010

Telford Homes' proposed access to Site 7 - Tonka Trucks anybody?

MERA Chair Mark Taylor demonstrates the width of
the proposed access to Site 7 on the Eric & Treby Estate redevelopment
The Revised Construction Management Plan (part of planning condition 5) indicates that this will be the access route for all construction traffic needing to get to Site 7 (the open space fronting on to Burdett Road and next to the Tabernacle Church).

This view is taken from Open Space 5 (the tarmac space between the Tabernacle Church and the Eric Street maisonettes/gardens) looking north.  Note the width!
  • slightly more than Mark's outstretched arms
  • about the same as a wheelie bin!
MERA understands that Telford Homes will be downsizing their trucks.  Presumably this is when Tonka Trucks make a reappearance on the local scene? ;)

Yes, you've guessed it!  MERA will be highlighting this traffic access proposal as part of the MERA response to the revised traffic access management proposals which form part of the revised Construction Management Plan.

Consultation closes tomorrow - 1st September 2010.

[UPDATE #1 - We've had discussions with the Tabernacle Church whose rear wall is indicated on the left in the photo.  Apparently the Church was approached 10 weeks ago with a request to knock the wall down.  A meeting has been held with advice taken from a party wall surveyor and the Tabernacle are declining to knock down their wall.  The wall has been there for over 50 years and encloses a necessary turning space for vehicles visiting the church. 

UPDATE #2 - The Tabernacle Chuch have now queried access with Telford Homes.  The Construction Director Jeremy Brett,  is now indicating that there is no current plan for a way into the site and that they will have to find another way in.  Which of course is NOT what is indicated by the designated route plan nor the route instructions for Site 7 (see page 13 for route instructions!) in the Construction Management Plan which is currently out for consultation.  This is what preciptated our discussions with the Tabernacle and their discussions today with Telford Homes.

Where next we wonder?] 

Wednesday, 25 August 2010

Proposed Construction Management Plan - version #2

The revised version of the Construction Management Plan for the Eric & Treby Development has been posted on the Council's planning database and individuals who have noted their interest in this development have now received letters about the consultation process
PA/10/01572 : Submission of details pursuant to condition 5 (construction management plan) of planning permission dated 22nd March 2010, reference PA/09/2065.
The deadline for responses is the 1st September. 

MERA will be reviewing the new proposals in detail.

To date we have noted:

MERA asked for:Submission includes?
Much more information about traffic access and circulationYES
Details of planned routes to and from each individual numbered construction site and numbered landscape site which:
  • meets health and safety requirements and 
  • recognises the existence of a large number of children on the estate
Appendix 3 provides details of planned Delivery Route Vehicles.
 
Reference is only made to numbered construction sites and omits any reference to all numbered landscaping sites despite the fact that removal of earth and delivery of new landscaping materials will involve considerable site traffic - as has already occurred. 
Details of all planned parking bay suspensionsAppendix 4 provides a plan of parking bay suspensions.
Details of all Hoarding having an impact on pedestrian Traffic and measures to provide adequate separation of pedestrians from construction traffic which meets health and safety requirements and recognises the existence of a large number of children on the estateNO
Appendix 2008 plans re development submitted indicates fencing associated with the completed scheme and proposed landscaping. 

The legend provides no indication of how hoardings are represented on the site plan.
Details of how the Grade 2 Listed Piers and Gates into St Clements Hospital were to be protected from accidents with construction vehicles due to the very tight turning circle for construction lorries.Appendix 9 Provides drawings of the St Clements Hospital Pier Protection Plan. This includes creation of concrete bollards, hoarding and removal of the iron gates to a place of safety during construction.

This work has now gone ahead in advance of the approval of the CMP.
Improved communication with residentsNO
Proposals are inadequate as will be evidenced in the MERA response.
Better management of noiseNO
Exclusion of all EEH traffic associated with other developments from the site due to near accidents generated by drivers of such vehiclesNO 
Schedule of Works (Timeline) for all numbered construction sites and all numbered landscaping sitesNO
Furthermore the timeline for the deliveries and removal of waste works contained in the Construction Management Plan assumes a one site development - not a complex set of sites which are coming onstream at different times

There is also no recognition whatsoever of the fact of the existence of another major contract on the Estate identified as part of the original planning application. 
Explanation of how the contract for the works relating to new buildings is going to work alongside the separate contract for to achieve decent homes standards - as identified in the original planning applicationNO RECOGNITION OF THE SECOND CONTRACT and associated movements of goods (ie kitchens and bathrooms)

Wednesday, 11 August 2010

Memo to Tower Hamlets Planning

LB Tower Hamlets website page - for accessing Planning Database

MERA gets involved with looking at a lot of planning applications and applications for approval of details relating to planning conditions for the Eric & Treby Estate redevelopment.  HOWEVER we have lots of diffculty finding planning applications on the planning database UNLESS we know the case reference number of the application or the "secret address code" for accessing them.

How local residents get told about planning applications

If you live very near to the address of a planning application you have to be notified about the application by letter - and the Council should write to you.  However not everybody gets sent a letter.  The Planning Department's notion of "who needs to know" (which is quite tightly defined) and our experience of "who needs to know" are sometimes very different. 

All objectors to planning applications who have asked to be kept informed also get sent letters whenever another one is posted seeking approval for conditions.  These letters give the case number reference code of the application.

So HOW can you find out about planning applications which affect your property if you don't get a letter?

In theory, you can look up your street name or post code and find all planning applications which affect your property. Except this isn't quite the way it actually works in practice

Anybody who wants to know should be able to access any planning applications relevant to their area by looking them up online via the planning database.

HOWEVER There is no scope within the Planning Application Database to recognise planning applications which affect a large area and several streets.

It's not actually possible to access planning applications by address as suggested.  That's because, despite the nature of planning applications received, the database is extraordinarily parochial and can only list ONE ADDRESS for each application.  This means that even if a planning application affects several streets these will not be identified on the planning database as being affected. 

When raised with the Planning Department initially (when all estate redevelopment planning applications were listed under Treby Street only) the response was to create a whole new planning identity called "The Eric and Treby Estate" - which is an improvement - EXCEPT that this cannot be found via a search of the the address based part of the Planning Database!

MERA thinks the residents of Mile End should be entitled to the same quality of access to planning applications as all other residents of the borough - where planning applications affecting their street get listed on the database by street name.

We think the basic standard should be:
  • planning should not assume that everybody with a "need to know" has access to the planning case reference number 
  • every planning application affecting a large area and several streets should ensure that ALL these streets are referenced on the planning database
  • all streets affected by a redevelopment should list ALL the relevant planning applications
This email has been sent to Tower Hamlets Planning Department.
From: Mile End Residents Association
To: Tower Hamlets Planning Department

Why are local residents living in Mile End denied ready access online - as required by e-government - to planning applications which affect them?

Why is "The Eric and Treby Estates, Mile End, Treby Street, London" not listed as an address on the Council's Planning Database under "e" or "t" in the alphabetical section of the database?  Many of the estate roads on the Eric and Treby Estate are not recognised at all by the Planning Applications despite having numbered construction sites in them which relate to the current redevelopment.

If "The Eric and Treby Estates, Mile End, Treby Street, London" is put in as a search term (ie if you already know this is what you have to look for) it brings up all the numerous planning applications relating to the Eric & Treby Estate run by EastendHomes and associated decisions - including planning conditions.

We note that there are also a number of addresses which are "estates roads between (name of road) and (name of road)" which are listed under "e"

So why is "The Eric and Treby Estates, Mile End, Treby Street, London" missing from the alphabetical listing since it is obviously recognised by the planning applications database?
--
Mile End Residents Association
MERA - website | MERA - blog | MERA on Twitter | MERA on Flickr
PS  If you want to know about all the current planning applications and applications for approval of details for the Eric & treby estate take a look at the Redevlopment Page at the top of this blog - where they are all listed - with numbers, descriptions and links to further details
__________________________

Monday, 9 August 2010

Parking suspensions and access: MERA wants better communication

9th August 2010: 
Suspended parking and road works in Brokesley Street

This is an extract from a letter we've sent to the officers of Tower Hamlets Council asking about matters relating to the suspension of parking bays in Brokesley Street.

We've also separately asked Planning to provide some reassurance about the quality of the liaison between Parking and Planning in relation to development works.

Let's see what they have to say......
Could you please answer the following questions:
  • Normal notice period for all planned utility work:  What is the standard notice period given to local residents for suspension of parking bays due to planned works by utility companies?
  • Notices - allowance for summer holiday period:  What is the normal notice period given to residents about suspensions of parking bays during the summer holiday period when people are likely to be away on holiday?  (We would regard at least 14 days for all planned works as an acceptable standard)
  • Application date:  On what date did you receive the request from Transco for the suspension for planned development works in connection with the development of site 10 of the Eric & Treby Estate development
  • Works to comply with Council Planning Permission/Conditions:
    • Were you aware that the planning permission for the development at site 10 of the Eric & Treby Street development requires that the Construction Management Plan MUST be approved before any development works can take place? 
    • Did you check to see whether the development had complied with all pre-commencment planning conditions and developmnents works could proceed BEFORE you granted permission to suspend the parking bays.
  • Adequate Notice: 
    • On what date did council officers fix the notices and mark up the pavement relating to the suspensions of parking for this planned work in the street?  
    • Did this comply with the standard notice period required before planned works by utility companies can commence?
    • Why did local residents not receive a letter as we have done in the past for lengthy suspensions of parking in most of the road?
    • Why did the notice not state what would happen to cars which remained and how much it would cost to retrieve them?
  • Customer Services/Queries:  Why did the suspension notice not provide a telephone number for queries?
  • Customer Service/Comunication:  Why did the suspension notice not say which organisation had requested the suspension?
  • Hours of working in residential areas:  When granting permission for the suspension of parking
    • Do you require limitations on hours when works/noisy works can take place? 
    • Do all utility works relating to a developent need to be compliant with standard hours for constructions works in residential areas imposed by the Council re planning applications?  (eg no works at all before 8am)
    • For the record works had started in Brokesley Street BEFORE 8am this morning (breaching Planning Condition 14) and a very noisy machine (requiring ear protection for the operative) was being used between the hours of 8am and 8.30am (apparently breaching Planning Condition 15 which limits noisy work to between 10am and 4pm). 
  • Liaison:  Are you satisfied that Highways/Parking Services Liason with the Planning/Development Control is adequate for the purposes of ensuring that all suspensions of access to streets and pavements for the purposes of necessart works associated with a development ONLY takes place in complete compliance with the Council's planning conditions?
Our principal aim in writing to you is to AVOID any repetition of:
  • lack of adequate notice to local residents about parking suspensions
  • lack of adequate communication with residents as to who to contact in relation to the suspension of parking
  • avoidance of any fines being levied on any resident who has not received adequate and approrpriate notice
  • apparent lack of awareness by Parking of the terms of the planning permission and pre-commencement planning conditions
  • works which do not comply with the terms of the planning permission (eg unapproved works prior to the approval of all pre-commencement planning conditions)
  • specifically impact breaking and noisy work outside the hours as stipulated in planning condition 15 of the Decision Notice for this development
We also want reassurance that proper consideration will be given to the requirements for 24/7 emergency access and disabled access EVERY TIME parking bays are suspended for holes to be dug in the road during the course of this development