Top 10 Problems with the Kerrygold Garden

Open Space 3, which contains the Kerrygold Garden, has a large number of problems which are summarised below.

MERA started out at the beginning of this week talking with local residents who were very annoyed that the garden had been "closed" making it necessary for them to move The Big Lunch from the Recipe Street Garden to the strip of grass at the edge of Eric Street (see The Big Sunday Lunch moved).  Towards the end of the week, we're now very clear that there are a significant number of problems with this development.

We've listed them below.
  1. Unlawful Development:  Before any of the development can start, the architects and developers acting on behalf of EastendHomes have to satisfy the planners about a number of different planning conditions.  This development went ahead despite the fact that these conditions had not been satisfied.  The site has therefore been closed because of its unlawful development in advance of the provision of information which is required to satisfy all the pre-commencement planning conditions.  
Breach of Condition 11 (Landscaping Strategy and Management Plan)
A site visit revealed that Open Space 3 has been completed, including landscaping, prior to this condition being formally discharged.
Planning Enforcement Letter
  1. Not developed according to permitted design - Somebody somewhere missed the point.  You don't go to the trouble of seeking planning permission and get designs approved so that you can then go and do the development according to a completely different design.  Permission is for the design specified in the drawing submitted with the planning application and that's all.  If you want to do something different you have to submit a revised design and get formal approval - which also requires formal consultation with local residents.
  2. No formal consultation on the revised design - There's no problem about revising a design so long as you give ALL the relevant people the opportunity to comment on it.  Consultation is NOT the Project Manager asking a few people whether they agree the development should go ahead.  Formal consultation is done by the Council's Planning Department who have to ensure that everybody who needs to know has been informed. This did not happen.  Read the repurcussions in the next post.
  3. MAJOR loss of amenity - due to excessive noise at night.  This week MERA has had to write to Planning to advise them about a major complaint by local residents.  The open space is now being used all night long by young men who are congregating there in groups and making a significant noise.  Residents are now finding it very difficult to sleep at night.  Residents are also very disappointed that the Safe Neighbourhood Team have done absolutely nothing to address this issue despite the fact that a Dispersal Zone is in place which includes this garden.  Recently residents chose to spend money allocated to the area for improvement - on removing the brick walls which the men used to sit on.  These were replaced with fences so the young men have moved to the tables and chairs in the garden.  The Crime Prevention Officer is very clear there should be nowhere for young men to sit.  Residents will be making representations on this issue to the Safe Neighbourhood Team at its meeting next week.  The point is the design should be designing out activities with a negative impact on local amenity rather than increasing problems for residents!!!
  4. Significant loss of green open space - A very significant amount of green open space for the children to play on has been lost because the car parking area is now a lot bigger than the permitted area.  Yet again we appear to have developers who make it up as they go along. If you compare area of parking on the plan to the area of parking in reality, you'll see very quickly that the space allocated to parking has grown very significantly.  It should be about 25% of the site and instead it's more like 40% of the site
"I've yet to see a builder with a plan in his hand"
Chair of MERA

Council Approved Design for Open Space 3 - between Eric Street and Windermere House
  1. Unlawful materials used.  When Councillors were approving this application, one of the points they made to residents was that they were NOT going to allow open space to be reduced unless very high quality landscaping was used on the remaining areas of open space.  They gave permission for high quality materials.  The developers have substituted with cheaper materials.  MERA has complained and EastendHomes have been told that the specified materials need to be used.  The tarmac should be removed before the development is completed and MUST be removed before all homes can be occupied (see Planning Condition 11 - Landscaping Strategy & Management Plan)
  1. Site drainage has been affected - By substituting tarmac for the approved pavoirs, the ratio of permeable (water can go through) to impermeable (water sits on top) materials has been changed.  Increasing impermeable materials increases the puddles and the risk of flash floods during heavy rain.One of the reasons why there is now more flooding around the country is because more and more people have paved their gardens and the water has nowhere to go   Consequently the Council seeks the use of permeable materials whereever possible eg car parking areas and permeable materials were what it had approved.
Breach of Condition 3: Site Contamination
After conducting a site visit it is apparent that Open Space 3 has been completed and foundations have been laid at Site 14, prior to Condition 3 having been formally discharged.  I have advised the developers that Open Space 3 and site 14 must be closed
Planning Enforcement Letter


 Extract from 1895 OS Map showing Rope and Twinery Works on Open Space 3 and 4
  1. Site Contamination:  We have identified from maps that the majority of Open Space 3 (and 4) used to be part of a Ropery and Twine Works. This part of the site includes all the locations where the arsenic, lead and nickel were found in the previous tests as well as the carcinogenic polyaromatic hydrocarbons which are found throughout the Eric & Treby Estate. The results of tests done by Herts & Essex Site Investigations (summarised on Appendix 1 Site Plans and Conceptual Model/Sheet 7 March 2010) very clearly indicate that Open Space 3 is the most contaminated part of the whole site.  In other words
    • no amount of additional testing is going to eliminate the EXPERT tests already done in March which identified the presence of Arsenice produced the recommendation that 0.5 metres of soil needed to be removed
    • None of these tests can be ignored when making an assessment about this site and reviewing the recommendations of the experts as set out in the report which has already been submitted to the Council in relation to the approval of details relating to site contamination/site remediation.  
  2. Poor Garden Maintenance:  Residents have commented to MERA that the plants are not being watered properly during the hot weather.  Expert opinion suggests that some of the plants have "bolted" because of the lack of water.
  3. EastendHomes doesn't have a very good track record when it comes to open space and places for children to play - (see British Street: Children must not play on this site!).  See above.
It's very depressing making lists like this - because this is the first part of the (unlawful) development and just look at how many things they've got wrong!

Hopefully by highlighting the issues we can get this changed as development proceeds on Eric & Treby.


If you want to be kept updated why not subscribe to this blog.  
You can do this by clicking the link below 
  Subscribe to MERA - Mile End Residents Association Blog by Email

Wednesday, 23 June 2010

Eric & Treby Estate: Site Contamination

The Eric & Treby Estate is contaminated.  It's not alone.  Significant areas of land in urban London in the nineteenth and early twentieth century are also contaminated because they used to be home to industries with practices which are now not allowed.

The standards required for building land now are much higher than they used to be in the past because we now understand more about how dangerous some contaminants can be for people's health.

This post outlines what is a complex topic.  We've had to learn about it and what follows relates to a meeting with Tower Hamlets Planning and reading the detailed reports and proposals

Planning Conditions submission - Site Contamination

Before any work on the site can commence - other than site investigation works - the client and contractors have to satisfy the Planners that they can meet the planning conditions.  One of these relates to investigating the contamination of the site and making good.

The latest submission from the architects for EastendHomes to Tower Hamlets Council Planning Department, concerning the satisfaction of the planning conditions, concerns Site Contamination and Site Remediation.

If you click the link to PA/10/01093 - Approval of Details - Site Remediation (re planning conditions relating to planning permission PA/09/2065) you can see all the evidence which is being presented to the Council about:
  • desk top analysis of previous contaminating industries on the site.
  • evidence from 36 bore holes of the soil conditions and what has been found under the ground (this also affects what sort of arrangements need to be made for foundations)
  • identification of the areas which need site remediation works
  • proposals as to how the site will be cleaned up (the Site Remediation Strategy) and what quality controls will be put in place to contain dispersal of the contamination.
This is complex scientific area - but the evidence is there for you to see and comment on should you so wish.

What used to be on the Eric & Treby site

Herts and Essex Site Investigations have undertaken a survey.  They are a firm of Geotechnical and Geo-Enviromental consultants, who provide soil surveys for a wide clientele.

Their report (Phase III Remediation Strategy) indicates that they have found widespread contamination from Arsenic, Nickel, Lead and PAF contaminated soils at the Eric & Treby Estate.

The site history (page 4 para 1.2) recorded in the report is extremely ungrammatical which gives rise to concern as to the author's command of English in relation to reading and site investigation as well as writing.

The report indicates (without citing the evidence found) that the site has previously been home to a Rope Works and a chemical works.  This is why Ropery Street is so called.

This is a very likely source of the contaminants.

The very large quantity/depth of what is essentially rubble on the site is probably due to either bomb damage (this was an area which was targeted in the Blitz of 1940) or is the rubble from the demolition of older residential properties and/or factories.


Which are the sites which need remedial works?

Page 18 of the Phase III Remediation Strategy provides a plan of all the areas of soft landscaping requiring works.  As you can see it's a lot of land.  There are also more detailed plans for each site showing the area requiring remediation on top of the proposed soft landscaping.

Sites requiring remediation works



Appendix 1 Sheet 2 shows the contamination locations - and also all the proposed sample locations which were not done and for which there is no report.
Example:  The Recipe Street Garden - created without any remediation works - has registered Arsenic, Nickel, Lead and poly-aromatic hydrocarbons above the allowable levels identified in the Site Remediation Strategy (the latter can cause can cause cancer, mutation in and abnormal physiological development)
What needs to be done - the Site Remediation Strategy 

This is what the experts HESI are saying and recommending in relation to the areas of soft landscaping
Possible site Remediation Measures
Site Soils: 
  • Confirmation that the entire site area is contaminated and that remedial measures are required to remove risk to all areas of soft landscaping
  • Likely removal of soils within the site to remove the risk to human health
  • alter the chemical state of the site soils to reduce the impact of the end use soils on the proposed receptors
Phase 11 Remediation Strategy - Site at Eric and Treby estates (para 2.5 page 8) 
Soil
The site has been classed as contaminated by Arsenic, Nickel, Lead and PAH with concentrations, whilst in place, are not significant although will require cleaning facilities and protective clothing in order to remove risk on a temporary basis to the workforce
Site Remediation Strategy Phase III Page 9 para 3.1
YET AGAIN(!) we have a plan which makes absolutely no reference to the protection of the public on a multi-site development within a high density residential area.

The identified risk based on the information gained suggests that the contamination within the site is likely to cover the whole site and, as such, all areas within the site should be considered as contaminated.....The risk within the site has been identified as within areas proposed for soft landscaping where excavation of the areas should be undertaken to remove the risk to human health
Site Remediation Strategy Phase III Page 9 para 3.1

The Remediation Strategy is incomplete as to proposed areas requiring excavation/remediation.  Paragraph 3.2 refers to a non-existent Table 1

Measures to remediate soil include:
  • Half a metre of soil needs to be removed under the communal areas of soft landscaping
  • 0.9 metres of soil should be removed from the area of private gardens due to the scope for people  to use the gardens to grow vegetables for eating.
  • All excavation sites will need to be photographed to provide evidence of the depth of the soil removal
  • After removal of soils, new soil will need to be imported and the quality of the imported soil will need to be tested.
For some unknown reason no bore holes were sunk in Brokesley Street and this is not identified as a site.  In fact it's unclear whether it has even been investigated.  The area at the rear will be used for gardens and may well also need to be excavated.  We'll be commenting on this aspect in our formal comments on the planning submission and in relation to the disturbance of the roots of the very old lime tree. 

Land Gas:  Testing is ongoing and there are no proposals as yet. 

Foundations: The report recommends foundations of at least a metre.  This is because large parts of the site are covered by rubble.  One can speculate that this might either be due to bomb damage during the war (ie the reason why large parts of Tower Hamlets have newer housing)

Capping is identified as an effective way of dealing with the sites which will be built on.

Decontamination Facilities:   Washing/cleaning facilities are to be provided attached to the office facilities for all contractors and visitors.  Everybody will be required to wash and decontaminate clothing/boots before departing from the contaminated sites

It's unclear how they get to the washing/cleaning facilities along public streets and pavements to get to the cleaning facilities for the decontamination.  Perhaps the expert advisers don't think it matters if the streets and pavements are contaminated with whatever has to be removed by cleaning? We think it does!

Site Verification Plan:  Telford Homes are to prepare a site verification plan according to Model Procedures for the Management of Contaminated Land as required by the HESI
It's entirely unclear whether this site verification plan has been prepared and completed prior to the opening of the Recipe Street Garden - a site identified as requiring remediation works.
We're not happy with the cavalier approach to Site Remediation Works demonstrated to date.  Having met with the Planners last Friday, we're happy that planning conditions can contain the contamination.  However we're not happy that actions to date have complied with the proposed actions for a Remediation Strategy.  Mile End Residents Association will be making detailed comments to Tower Hamlets Planning. 

One issue we intend to focus on is the quality control over and the validation of remediation works prior to new soft landscaping being opened to the public.  We will want to know how exactly the Recipe Street Garden has complied with the plan and, if necessary, we will be asking for an Enforcement Investigation.


Commenting on the proposal to meet the planning condition

MERA will be submitting a formal comment on the quality of the investigation , the report and the proposals

You also have the right to comment if you so wish.  

If you want to comment on the current planning submission PA/10/01093 - Approval of Details - Site Remediation you can do so by commenting online here Comment On Application or by writing to the Council

We suggest you read the documents first

The deadline for comments is 28th June 2010.

If you have any queries please contact MERA
If you have a comment please leave it below
Email MERA with photographs of your concern

Tuesday, 22 June 2010

Consultation and BBQ on contaminated garden

The invite from EastendHomes

EastendHomes and the Mile End Estate Management Board appear to be trying to improve their abysmal reputation for dialogue and consultation with tenants/residents by having an event to "discuss the improvements to the Estate".  However the invitation appears to have overlooked a few important facts.

EastendHomes do not listen. We can only conclude that EastendHomes suffered from complete deafness when they attended all the Strategic Development Committee meetings. 
  • In no way do residents of the Estate consider the infill developments as "improvements"!  To characterise the invitation in this way is just plain insulting.  Many tenants/residents campaigned throgh five long meetings to get the developments rejected.  Perhaps this blog needs to remind Eastendhomes about how many people signed petitions, wrote letters and regularly turned out for the meetings of the SDC at the Town Hall?
 MERA protest at the Town Hall at Mulberry Place
  • Proposed developments on the Estate - for both social housing and private sector housing - are way in excess of that indicated as at the time of the ballot.  Many residents have said that they would have never have voted for the transfer if they had known what was going to happen to their estate.
  • The replacement of kitchens and bathrooms are also NOT improvements.  The internal works more correctly have the status of maintenance because they are required by central government to bring all the housing units on the Estate up to the mandatory "Decent Homes" standards. 
Lack of communication with ALL Tenants:  There has been no communication with the residents of Ennerdale House to date - and the consultation starts in two days time.  We got this invite from a resident of Derwent House

Lack of communication with ALL local residents:  As per usual - EastendHomes' appreciation of the impact that works to the Estate will have on all local residents is absolutely non-existent (but what's new?).  Nobody living in streets affected by the development have received invites.

Lack of awareness of Site Contamination and remediation required prior to all soft landscaping:  The consultation is to mark the formal opening of the Recipe Tree Garden (aka The Butter Garden).  It would appear that EastendHomes managers and management board have:
  • NOT read the contents of the reports that their architects have commissioned.
  • NOT appreciated the contents of documentation supporting the latest planning conditions submission to Tower Hamlets Council on their behalf PA/10/01093 - Approval of Details - Site Remediation
  • NOT recognised that half a metre of top soil may well have to be removed from all public landscapes area on the Estate due to the presence of widespread contamination. (see Phase III Remediation Strategy)
Possible site Remediation Measures
Site Soils: 
  • Confirmation that the entire site area is contaminated and that remedial measures are required to remove risk to all areas of soft landscaping
  • Likely removal of soils within the site to remove thr risk to human health
  • alter the chemical state of the site soils to reduce the impact of the end use soils on the proposed receptors
Phase 11 Remediation Strategy - Site at Eric and Treby estates (para 2.5 page 8)
In other words, the garden they are opening/celebrating may well have to be dismantled and soil removed to a depth of at least half a metre in order to remediate existing contamination.

A couple of good questions to start with during the consultation might be to ask
  • why don't EastendHomes officers read and act on reports? and 
  • why is EastendHome consultation always so poorly organised?
In the meantime we'll be blogging in future posts about the site contamination and plan for remediation works prior to our formal comments on the application for approval of details to satisfy the planning conditions

    Wednesday, 16 June 2010

    British Street: Children must not play on this site

    New play areas for children were promised by EastendHomes when decisions were being taken about the future of the British Street Estate (to the east of St Clements Hospital Site). This was reiterated in planning applications and project plans.
    ...plans for the complete transformation of the environmental quality of the estate, introducing over-cladding of buildings, green space enhancements and new children’s play areas.
    Leaside Regeneration project - British Street Estate for clients EastendHomes and Telford Homes plc (pdf file)
    The reality is somewhat different. Unfortunately children are not currently allowed to play in some of the so called "play area" on the refurbished British Street Estate.

    British Street landscaping - condemned on Health & Safety grounds
    The sign says: Children must not play on this site

    That's because the "landscaping" created by the developers has failed to meet the standards required to pass a health and safety inspection.

    Hence the fencing and the sign warning "Children must not play on this site"

    In addition no expense was spared in using spare building materials (a sewer pipe?) to create the play area. Supposedly covered by grass - but with little regard for the depth of soil or care that grass needs to actually grow!

    I wonder why the grass won't grow?
    This is a so-called play space!

    Residents of the Eric & Treby Street Estate can be reassured that MERA will be paying very close attention to ALL proposals for ALL landscaping on the Eric And Treby Street Estate including:
    • all design aspects
    • all materials used
    • all deviations from original plans as approved by the Strategic Development Committee
    The above scenes will NOT be seen on the Eric & Treby Street Estate.

    Note: The British Street Estate was redeveloped by Leaside Regeneration and Telford Homes plc