Saturday, 28 January 2012

A prompt response from Tower Hamlets Street Works

MERA has had two responses to the blog posts and emails sent to various council officers, councillors and Optimise
  • On Friday, MERA received an email and photos (see below) from a Tower Hamlets Street Works Officer following the despatch of emails to various parties within LB Tower Hamlets
  • On Thursday we got an acknowledgement of our email from Optimise - but no proper response to date.
We're grateful for the prompt response -  but have some issues we still want to pursue.  Read the Street Works email and our comments below.

Brokesley Street 16.45pm (after the contractors had gone home)
- the work is still not complete,
the road has not been cleaned to remove soil debris as required by the planning conditions
Street Works photo
Footpath Closed - but does this have a current permit?
Street Works Photo 26 January 2012

Hello Mile End Residents, following the receipt of your concerns and complaints yesterday I visited Brokesley St and took the attached photos.

These are TW-Optimise works - being undertaken by the section known as 'Developer Services', carried out by a Statutory Undertaker under the terms and conditions of NRSWA - New Roads and Streetworks Act.

As a Statutory Undertaker TW have the right to place and maintain apparatus within the Highway - and under their governing body, OFWAT, have the duty to maintain this supply, and also the duty to respond to a reasonable request for a supply connection.

These works are however monitored generally by the Highways Authority and subject to the Codes of Practise. These codes require the Undertaker to Notice these works, carry them out to a standard of reinstatement and again generally to complete works without undue delay, minimise disruption to road users, and where the access to a frontage is affected to allow for consultation before works start, (unless works are deemed to be 'Emergency' or 'Urgent').

Following discussion with Optimise personnel I understand these works were to have been carried out without closing the road formally and best maintain access for residents by suspending Parking Bays. To minimise the time on site the JCB 'Digger' was used where possible, the gang being aware of the need to maintain Emergency Service access at all times and able to move this vehicle if required.

It does appear that works were carried out after the formal Bay Suspensions were removed and this is a matter that will be discussed with Optimise to establish what went wrong here and how they propose to avoid a repeat in future.

We will continue to be aware of these works and the potential to cause concern to residents and the works will be monitored for any failing with regard to the specification following reinstatement.

Please let me know if you have any comments, and if you have further concerns regarding future Statutory Undertakers works in Brokesley St do not hesitate to contact the Streetworks section - if you can attach photos it does help, thanks, regards, CNH.

Charlie Harrison
Street Works Officer
CLC Streetworks
London Borough of Tower Hamlets
e-mail charlie.harrison@towerhamlets.gov.uk

The officer does not address:
  • the planning conditions relating to no access/no parking allowed by vehicles associated with construction (as these are - even if they are a utility company)
  • the parking of vehicles on double yellow lines as indicated in previous posts (which as the Council's own policy highlights cannot be suspended)
  • the parking of vehicles within suspended parking bays - not allowed as per the Council's own policy (ie the bays were suspended for access not for use by vehicles working on site)
  • the lack of consultation with residents about how the works were to be conducted and the potential for the road to be completely obstructed 
  • the inconvenience caused to residents by works taking place AFTER the parking bay suspension finished.  He recognises that requires further enquiry.
The Works are not Complete - but have no completion date
No permit number displayed re pavement closure
How does this comply with the Code of Practice? 
Compare to photo (below) of sign as at 26 January 2012 8.47am 
(Street works photo)
Optimise Notice photographed 26 January 2012 8.47am
Stated Completion date 27 January 2012
Permit Number 74YSYF
In addition three more matters not previously raised will also be pursued 
  1. the fact that the Optimise Notice now has no permit number and no completion date despite the fact the pavement is still closed (which was not the case prior to the works)
  2. the absence of any Notice of the Council order to close the pavement (Should it be closed at all?  When will it be open again?)
  3. the failure to mark the Optimise road works in the manner as required by the planning permission / Code of Practice (no lights at night earlier in the week when they were in the road, fences fell over on a regular basis)
We're also still wondering why none of the irregularities in relation to parking bay suspensions and parking on double yellow lines got picked up by the parking wardens.


We'll be corresponding further to ensure there are no further repercussions of this serious disregard of the interests of local residents and the contractor's breaches of the law and the Council's own policy on parking suspensions.

To date MERA has not received any acknowledgement or reply from any of the Ward Councillors or Development Control.

DO PLEASE TAKE PHOTOS / EMAIL TO MERA
IF YOU SEE ANY OTHER WORKS CAUSING PROBLEMS FOR LOCAL RESIDENTS


Friday, 27 January 2012

Suspension of Parking in Tower Hamlets - Policy and Rules

Highway Maintenance - parked on yellow lines
following several days of water works in 

Brokesley Street 26 January 2012
(There is no notice of suspension and no dispensation in force
and planning conditions prevent access by construction vehicles)

MERA has been looking up Tower Hamlet Council's Policy on Parking and Traffic Enforcement.

For the benefit of residents in the Mile End Area and all those who seek suspensions of parking bays we've reproduced the section relevant to the suspension of parking bays in this blog post.  (It starts on page 40 of the document which you can access by clicking this link)

We've highlighted the parts of most interest to local residents.
__________________________________________
This section reviews -
  • The exemptions included in the Council's Traffic Management Orders (parking and moving traffic)
  • The availability of dispensations from the waiting and loading restrictions
  • The ability to suspend certain parking regulations
Suspensions, dispensations and exemptions all seem very similar, but in parking they have quite specific meanings and uses, not only in relation to CPZs but more generally (and they are not the same as permits, which are explained in Section 5)
Suspensions


Having introduced (or "designated") a permitted parking place (permit holder, shared use, pay and display, doctor, disabled, etc.), it may be necessary to suspend it for a short time. (If the parking place is no longer required, or it is deemed that it would be better utilised for another purpose, it should be revoked. A Traffic Management Order is required to revoke a designated parking place).

Unless there are exceptional circumstances, the Council will only suspend a designated parking place in the following circumstances:-
a) to facilitate maintenance and repairs to the highway
b) to facilitate maintenance and repairs to services (gas, water,
electric, telecoms etc.) buried within the highway
c) business or domestic removal
d) building works
e) filming
f) at the request of the Police (events and public safety)
Anyone can request the suspension of a parking place (or part of a parking place), provided it is for one of the reasons stated above. The suspension is provided to help carry out a task or event but clearly causes inconvenience to those motorists who are then not permitted to use the parking place; and in extreme circumstances a long-term suspension (for example, to facilitate a major redevelopment) can impact on the viability of a small business.
To minimise the inconvenience caused by suspensions the Council will:-
a) only grant a suspension when absolutely necessary
b) restrict the suspension to the minimum space required to perform the task or carry out the event
c) restrict the duration of the suspension to the shortest possible amount of time ) consider the size of suspension in conjunction with the duration (i.e. a long term suspension is more acceptable if only a short
length of kerb is taken)
e) normally make a charge for each suspension based on number of bays/number of days plus administration charge, to encourage the speedy return of the parking place to its designated use. (These charges are reviewed annually and a “parking bay” is defined as 6 metres in length)
f) where there is a choice (and usually there is not), choose to suspend "pay and display only" bays rather than "permit holder only" or "shared use" bays
g) ensure that suspensions are correctly and clearly signed
h) monitor suspensions to ensure they are removed when no longer required
Generally, no more than ten car parking spaces will be approved per day for a suspension.
For a domestic removal a total of three car spaces only will be suspended (approximately 18 metres) and there is no charge for this type of suspension. If the applicant considers this to be insufficient space, additional space may be agreed and the normal suspension charges will apply.
Applications for suspensions should be made no later than five days in advance as the Council will give at least three days advance notice of the suspension for the benefit of residents in the area. However, this is not always possible as emergencies will require priority suspensions and the Council will be unable to give advance warning. Residents are advised to check that there are no suspensions in place on a daily basis if they are leaving their car in a permit or multi use bay.
All documents supplied to holders of permits issued by the Council will include advice to the holders of the need to check their vehicle every day and to ask a neighbour, friend or relative to do this for them if they go away for any length of time, leaving their car in a designated on-street parking bay (that might have to be suspended). All designated parking bays in the Borough might be suspended at some time.

Enforcement action will be taken against any unauthorised vehicle parked in a suspended bay, even if it is displaying a resident permit. Some residents believe that if a bay has been suspended for their use, to facilitate a house removal for example, they may park their own vehicle in the bay if it is not being used by the removal vehicle. This is not the case as a suspension is authorised for a specific purpose and may only be used by the vehicle engaged in that purpose.
Any vehicle parked in a suspended parking place will be issued with a Penalty Charge Notice (PCN) and authorised for removal to the Council's car pound. Removal is appropriate because the parking bay is required for another use during the period it is suspended
It is also important to note that a suspension is actually in force at any time, even if the bay would normally be in force during a shorter period. Where times are specified on the suspension notice this will not be the case, but if there are no times shown, enforcement action may be taken at any time during a 24 hour period.
A vehicle displaying a disabled person's parking exemption, parked in a suspended parking place, will be ticketed (PCN) and relocated to the nearest safe parking place.
There are occasions when suspensions are introduced without warning (usually urgent repairs to underground services). Any vehicle that is illegally parked in the bay at the time the suspension comes into effect will be ticketed and removed to the car pound. Any legally parked vehicle will also be ticketed (this creates a unique reference number for the enforcement action) and whenever possible be relocated. The Penalty Charge Notice will be subsequently cancelled.
Where a suspension is required for such a considerable time that the Council must reconsider whether the parking place should be re-designated (as it becomes apparent that the carriageway in question is again required for the passing of vehicles), it becomes inappropriate to levy a daily charge to encourage the early return of the parking bay since this is actually outside the control of the contractor/utility company.
We are committed to giving residents and other drivers as much notice of the suspension as possible, ensuring that the signs indicating that a suspension is in place are clear and give full details of the duration, location and nature of the suspension, to regular checking of suspensions and prompt removal when they are no longer required.
There are three further key points to parking suspensions:-
a) It is not possible to suspend a parking place to permit parking, e.g. the Council can suspend a parking place so that a wedding car can wait for the bride (or groom), but will not suspend a parking place so that guests can come to the celebrations after the wedding.
b) The suspension process can be open to abuse, e.g. a builder may request the suspension of a parking place to assist with delivery of materials to the site, and then use the suspended area to park his own van. Suspensions therefore need to be properly monitored and the Council will issue PCNs in these circumstances.
c) It is not possible to suspend a waiting restriction (yellow line) or waiting and loading restriction (yellow line and kerb blips). If this is what is (in effect) required, then it may be appropriate to grant a "dispensation".
Construction vehicle related to
Telford Homes Development and Thames Water Works in
Brokesley Street on 26 January 2012 (1.49pm)


Thursday, 26 January 2012

RESULT! Brokesley Street open again

Following this morning's blog post and various reports to the "powers that be" (see Optimise continue to ignore regulations in Brokesley Street), cars are now able to park again in the "suspended parking bays" at the top of Brokesley Street.

That's because the bays were NOT suspended for the 25-26 January 2012.

Brokesley Street 2pm 26 January 2012
The reality is that Thames Water - via its agent Optimise - OBSTRUCTED the street for two days without the necessary authority. 

There was no emergency which necessitated this obstruction.  These are planned works for a new housing development project - managed by Telford Homes - and as such should have been completed within the time allotted ie within the time allowed by the permits.

However the parking bays were rendered inaccessible by the fencing in the road and the works by Thames Water and its agents which took far too long to be completed.  Difficulties were caused for residents trying to get in or out of the street and delivery vans got stuck while trying to make deliveries.  Deliveries were taking place because of course there should have been no obstruction in the street!

Proper permits for suspending parking should have been in place at all times if required - but neither the developers Telford Homes nor the utility company Thames Water, nor their agenct Optimise made sure this happened.

Proper notice should also have been given to householders - but this did not happen.


Despite overhearing a contractor this morning stating that the fencing would be moved at the end of today, by midday the fencing had been moved back to the pavement - but not before it had succeeded in blocking a very large van making a delivery to the street.

We will now wait to hear from the Council what actions they will be taking for the fact that the road was obstructed without permit and construction vehicles are still parked in the street - on double yellow lines - which are not suspended!

Construction vehicle NJ57 GDF - parked on yellow lines in Brokesley Street
This vehicle has been reported to Tower Hamlets Parking and Transport for London - as will all construction vehicles which are parked in the road.  The place for parking is the Approved Access Route to Site 10 - via the old St Clements Hospital site


Optimise continue to ignore regulations in Brokesley Street

Thames Water's contractors Optimise (which combines contractors Clancey Docwra and J Murphy and Sons) are currently breaching:
  • the suspension of parking in Brokesley Street which was limited to 23-24 January 2012
  • the ban on construction traffic in Brokesley Street as per the planning conditions for the development on Site 10 (1 - 14 Brokesley Street).
It's worth repeating - that says "No Construction Traffic in Brokesley Street"

Roadworks are complete - so why is the fencing still there?

Where is the parking control notice
for 25-26 January 2012?
This follows on from the post on Monday when access to the street was blocked by contractors vehciles - see Clancey Docwra block Brokesley Street to emergency vehicles

The photographs in this post were taken just before 9am this morning.

The road should be clear of all fencing - because the holes in the road were completed yesterday.  There is now no reason for fencing to be protecting the area of road they have been working on.  

The other reason the fencing should not be there is because cars are now allowed to park on the other side of the street according to the suspended parking notice!

There are works to do to the pavement but:
  • they do not require the fencing which remains and 
  • if they do - then they need to apply for an extension of the parking suspension
The road should also be clear of all construction and contractors vehicles - as per the planning conditions - but it is not.  
  • There is a lorry parked at the top of the street 
  • an Elm Surfacing Van (Transit Connect - Vehicle Reg. HK57 FLC) - which is parked within the "suspended parking area".  Which means it's definitely breaching parking controls as it has neither a permit if the parking is not suspended and it's parked in an area of suspended parking (ie required for access in and out of the street) if the controls are still in force.
Our understanding is that the suspended parking bays are not suspended unless there is a clear notice and the area is marked on the pavement.

Elm Surfacing Van Reg. No HK47 FLC
reported to parking control and TfL
Brokesley Street has had a series of suspended parking bays - ostensibly for works - when nobody has turned up and nothing has happened.

We now have work occurring which ignores both the planning conditions and the parking controls.  This is completely unsatisfactory.

Luke, the Telford Homes Project Manager, knows all about this as he was present on site this morning when we arrived to take photographs.  He disappeared very rapidly from the scene as the camera appeared.  We wonder why.........

Reports of the very poor management of these utility/road works by Thames Water, Optimise and Telford Homes are being lodged by MERA with:
You can also send in your own reports.

UPDATE: Click on image to read report filed 10am on 26 January 2012

MERA will also be sending emails again to the London Borough of Tower Hamlets (Parking Control and Development Control)

This is the standard which Thames Water SHOULD be working to - over and above the requirements re planning conditions and parking controls.  

The Mayor of London's Roadworks Pledge

Roadworks should...
  • Be tidy and safe with a clutter-free site so it is safe for pedestrians, cyclists and other road users
  • Always explain what's happening through detailed, clear and consistent signage
  • Always have activity on site or, if not, explain why (e.g. concrete is drying)
  • Take up as little road/pavement space as possiblewith a compact working area and eliminating the unnecessary use of cones, safety barriers and storage of materials
  • Help keep London moving by working outside peak hours, re-opening the road to traffic at peak times and, where this is not possible, working 24/7 or extended hours to complete works as quickly as possible. Diversion routes should be clearly signed


Wednesday, 19 October 2011

Ennerdale House: Emergency Exit/Access Ignored

Ennerdale House: EMERGENCY EXIT OBSTRUCTED for people living in 90 flats
Telford Homes, its contractors and Site Manager are yet again ignoring the health and safety of local residents.

This photograph show the current obstruction to the EMERGENCY EXIT for people living in 90 flats in Ennerdale House.  In our view, the fences, bins and barriers also obstruct and prevent speedy access to the building by the Emergency Services in the event of an emergency.

This used to be a wide open space in front of a very tall block of 90 flats and 200+ residents.

A link to this blog post will be emailed this afternoon to:
  • Health and Safety Executive
  • Considerate Contractor Scheme
  • Local Fire Brigade
  • Local Ambulance Service
  • Project Manager, East End Homes
  • Owen Whalley, Head of Planning, Tower Hamlets Council
  • Development Control, Tower Hamlets Council
  • local Councillors
Collectively, Telford Homes, its contractors and Site Manager are being extremely negligent in failing to maintain an adequate emergency exit from Ennerdale House - a tower block of 90 flats and approx. 200+ residents.

Instead the Site Manager and the contractors are placing obstructions in the way of anybody needing to enter or exit this tower block because priority is being given to site traffic movements.

The scope to break left and right easily and quickly on exit is obstructed and prevented by high screens.  The opportunity to move forwards and away from the building is obstructed by refuse bins and large barriers.  It's a dangerous environment in the event of an emergency occurring in the building and a lot of residents needing or wishing to leave.

In addition, all of the above obstructions impede access to the building by the local Fire Brigade and other emergency services.

Telford Homes have a documented track record in completely failing to make adequate provision for emergency exits for residents and access by emergency access.  See 
What we want to see happen

The urgent and immediate priority is to make sure people are safe.

Telford Homes needs to ensure that:
  • there are no obstructions in the area of the emergency exit which might lead to delayed access or exit and injuries or worse to residents if there was an accident or serious fire or other emergency requiring people in any or all of the 90 flats to leave Ennerdale House this afternoon
  • there are no obstructions in the area of the entrance to the building which prevent speedy access by emergency services in the event of an emergency
We have asked ALL the above organisations and individuals listed at the top of this post to do whatever they can to ensure that a SAFE environment is in place ASAP for all the residents of Ennerdale House.  We will report back on how they respond.

UPDATE:

Response from Tower Hamlets Council - Development Control 27th October 2011
This would appear to me to not be a planning related matter and may be best resolved by speaking directly with Telfords or taking it up with the Health and Safety Executive.
It appears that Tower Hamlets Planning is saying, in effect, that it has no absolutely no interest in making it a planning condition or implementing any other action that requires contractors to keep emergency exits clear at all times during the course of a development on a housing estate.  


Will it take a nasty accident to establish that this is a very blinkered approach to the safety of local residents?


Response from Telford Project Manager - REFUSAL to speak to MERA about this matter


Response from Councillors - none to date


Response from Health and Safety Executive - none to date


Response from Considerate Contractor Scheme - none to date


Friday, 20 May 2011

Eric & Treby: Telford Drivers breach law yet again

It is against the law to use a mobile phone while driving ANY vehicle.  Nevertheless the drivers employed by Telford Homes appear to think they are exempt from the law and other construction/health and safety regulations which prevents them driving within the Eric and Treby Estate without paying due care and attention to other road users and pedestrians - and observing the law!

Telford Homes Driver on mobile phone
in front of Ennerdale House - a high traffic area

while driving a JCB 535 125 Telescopic Handler and moving supplies
around the Eric and Treby Estate
Recently residents witnessed the Return of dangerous vehicle manoeuvres by Telford Homes - which also involved the driver of this yellow vehicle performing dangerous manouvres on the public highway (Hamlets Way).


Telford Homes driver photographed driving while using a mobile phone
at 9.28am on Friday 20th May 2011
The vehicle in question is a JCB 535 125 Telescopic Handler supplied by B&T Plant Hire
B&T Planthire Ltd, Surrey (Head Office). 71-75 Amenity Way (off Garth Road) Morden, Surrey SM4 4AX
Tel: 020 8335 3477 Fax: 020 8330 1330
E-mail: sales@bandtplanthire.co.uk


B&T Planthire Ltd, Kent. Thames Side Terminal, Salt Lane, Cliffe, Kent, ME3 7TA
Tel: 01634 221 496 Fax: 01634 222 539


All machines comply fully with HSE Regulations.
It was driven by a driver wearing a Telford Homes jacket who was not complying fully with all relevant HSE regulations.

A link to this post and the previous post about poor driving on the Eric & Treby Estate is now going to be sent to
  • Tower Hamlets Council Planning Enforcement 
  • the Health and Safety Executive 
  • the Considerate Contractor Scheme, 
  • B&T Plant Hire, 
  • the Project Manager for East End Homes and 
  • the corporate head office of Telford Homes - as clearly the project manager for Telford Homes is not doing his job properly
  • local ward Councillors who are on the East End Homes Board - Councillor Rachael Saunders and Councillor Motin Uz-Zaman 
It is OUTRAGEOUS AND UNLAWFUL for ANY driver of ANY PLANT to drive at ANY TIME on public highways or in any highway area used by the public in a dangerous manner or without due care and attention and which breaches relevant traffic safety law and ALL regulations relating to construction sites and health and safety.  
  • There can be no exceptions.  
  • This is a densely populated housing estate with lots of small children.
The next time we see this happen we will also report Telford Homes and the driver to the Metropolitan Police.

Wednesday, 4 May 2011

Return of dangerous vehicle manoeuvres by Telford Homes

Today we will be writing, yet again, to the Enforcement section of Tower Hamlets Planning Department - because, yet again, we are seeing very poor driving behaviour by the drivers of construction vehicles on the roads of the Eric & Treby Estate.

In the past we have had cause to highlight numerous offences by the drivers employed by the Telford Homes contractors.  There is a Traffic Access Plan and a Construction Management Plan which govern what should happen on in terms of how vehicles move around the Estate.  When this is ignored by drivers we will report offences.

U turn by a yellow construction vehicle in Hamlets Way

A member of our residents association yesterday rang us to report having seen a very large and very yellow construction vehicle (which has been working on the various constructions sites) doing a speedy U turn at the junction of Hamlets Way and Eric Street just before 4pm when the children are coming home from school.  There was no banksman in sight.

This is NOT permitted as part of the Traffic Access Plan.  It's a risky manoeuvre for an ordinary car at that time of day never mind a vehicle which is three times the size of a car.

It's time to get the cameras out again.  Next time we will be reporting the vehicle and its registration plate to the Police for dangerous driving.

If you see a construction vehicle doing something dangerous, get the registration plate details, take a photo and telephone us on 07932 626340 with details of what you saw.  We will then report it to the Planning Department, the Police and the Considerate Contractor Scheme as appropriate

Let's keep the roads safe for the children


Monday, 31 January 2011

Telford Homes breach planning permission at Site 1 - again!

Telford Homes have started building on Site 1 despite the fact that they have failed to complete all the pre-commencement planning conditions.

Condition 8 relating to waste management arrangements remains outstanding - of which more later.

We heard this morning that Site 1 had been withdrawn from the application submitted to date - and we're not surprised!  So, in principle, there should be no development on site except excavations of foundations whereas in reality some considerable progress has been made above ground. This is despite the fact that Telford Homes have already had a formal written warning by Owen Whalley, Tower Hamlets Lead Planning Officer,  about ignoring and breaching planning conditions in relation to The Eric & Treby development.

This morning we've sent the following images (below) to the responsible planning officer.  Telford Homes don't appear to be able to read their own plans - as well as not being able to read planning conditions.

This is a very clear breach of the plans for the approved development at Site 1.  The plan is for the rear of Site 1 (next to the old skip area) and the photo has been taken from a flat on that corner of Ennerdale House.

plan for development next to rear of Ennerdale House (next to refuse area)

actual development at the same location
bricks are ABOVE ground / broom handle gives scale
Note the broom handle lying on the ground which gives the scale of the gap left between existing building and new development.

There is no way that the proper distance between the existing building and the approved footprint for the new building has been located correctly.

So - is this yet another example of Telford Homes contravening approved planning permission as well as ignoring the terms of pre-commencement planning conditions?

We expect that Tower Hamlets Planning will be along shortly to inspect the illegal progress being made on site 1 to date.

We'll be very interested to hear what Mr Whalley has to say about this development.......


Friday, 14 January 2011

MERA gets noisy/dusty demolition stopped

Yesterday Mark Taylor, Chair of MERA contacted Tower Hamlets Environmental Health in connection with the very noisy and dusty demolition of the Walkway (Site 2b) next to Windermere House by Telford Homes's demolition contractor.

As a result the demolition site was yesterday shut down by Environmental Health.

Yet again the appalling standard of project managment by Telford Homes of this development - which ignores planning conditions and their own plans - has overstepped the mark - but our Mark is "on their case"!

This is what happened.  This is the content of the email which Mark sent yesterday
Demolition has started on the footpath/bridge at site 2B and is presently producing an excessive amount of dust which is being carried down the length of the bridge across our estate.
This work is ongoing at the moment - See video here taken at 13.00 on Thursday


The dust is rising up to the top floor walkway of the adjacent Windemere House where I know for sure (a resident with a serious medical condition lives). I spoke to his daughter today and she tells me that they received no warning from the developer this work was due to commence today.
This work is having an adverse impact on the air quality of the site and those living close by.  The planning conditions require the use of a hose/spray to damp down materials. There is a man with a low pressure hose vaguely pointing a hose in the general direction but as you will see from the video but this is clearly ineffective.
We look forward to a prompt response to this obvious disregard to the health and safety of local residents living on our estate as the developers clearly find it hard to grasp the fact that people live here and with just a little thought the regeneration/development process could be conducted with acceptable regard to residents health and safety.
This email is being copied to:-
  • Richard Murrell (LBTH Planning case officer).
  • Edward Hardy at the Considerate Contractor Scheme.
  • Mile End East ward councillors who are members of EastendHomes Board
  • Paul Hems at the HSE
  • Bernie Cameron (Chair Mile End Estate Board)
  • Andrew Osborne (EEH Project Manager)
This is the email which Mark and MERA received today.  We calculate that's two hours from video to shut down on site.
Dear Mark,
Following you email yesterday, I attended site 2B and stopped all works on site at about 15:00. I agreed with the contractor that no works should take place till the got more suppression mechanism on site. I believe that they have increased water suppression on site today..........
Okey
This is the demolition contractor who has committed numerous infringements of planning conditions in relation to health and safety - one of which has the potential to result in a criminal prosecution.......

We will be following up the behaviour of Telford Homes and their disregard for the health and safety of residents with both the Health and Safety Executive and the Considerate Contractor Scheme.

Saturday, 8 January 2011

Ennerdale House - the rubbish problem continues

After a period of improvement the Ennerdale House rubbish situation takes a nose dive.
On the up side the recycle bins are all "non contaminated".
However with no further space in the general bins how long will this last?
Sat 8th Jan 2011 09.40 

Two months plus and counting........

It's fair to say that the residents of Ennerdale House have been doing their bit. Now the additional non-recycling bins have been provided the rubbish which can't be recycled is being put in those bins and only the recycling rubbish is going in the purple bins

Which rather proves the point that it was the absence of adequate rubbish collection facilities and adequate communication which has been causing the problme - NOT the residents.

However - the the numbers of non-recycling bins are still inadequate and/or the frequency of the collection needs to be increased because unsightly rubbish spilling out of bins is still occurring.

All 3 general waste bins are full to overflowing
These and other discarded rubbish is in full view of residents of visitors to Ennerdale House
Sat 8th Jan 2011 09.40
Another report to Fix My Street has been made!

MERA's complaint about this problem was first reported to the Council on 31st October 2010 after Telford Homes blocked off the access to the rubbish skip at the rear of Ennerdale House without any prior notice or communication with the residents.

Two months later the problem is still as bad as ever.  There is no solution and, whichever way you count the number of days, it's very clear to us that this problem is in the final stages of the complaints process prior to moving on to the Local Government Ombudsman

It is totally unsatisfactory that the problems with the collection / storage and disposal of residents rubbish - within the context of the regeneration scheme - should take so long to be resolved.

Links to previous posts about the Ennerdale waste management problem
Implications for the planning condition relating to waste collection

Monday is the final day for consultation on the planning condition relating to the revised waste collection arrangements.  MERA will be detailing all the problems which have occurred to date with the temporary arrangements and why reliance on the proposed method of collection cannot be supported.


Friday, 7 January 2011

Telford Homes keeps breaching planning conditions

Telford Homes obviously have no regard for Tower Hamlet's Council's Planning Department whatsoever - or they wouldn't keep breaching planning conditions.  Either that or they don't know which day of the week it is!

Eric & Treby Redevelopment - Site 1:  
Construction commences in advance of completion of prec-mmencement planning conditions
The processes relating to the pre-commencement planning conditions for Site 1 have not yet been completed.
CONDITION 8 - Refuse and recycling: Required prior to commencement of development (with exception of site preparation works and the digging of foundations).  PA/10/00718 - Refuse and recycling for all NEW BUILD atSite 10 (Brokesley Street), site 12 (Beckley House), site 14 (Ropery/Eric Street) ONGOING  + PA/10/01921 proposal for non-material amendment to revise wording to limit to "prior to commencement of development on each new build site" + PA/10/02464  Submission of details pursuant to discharge of condition 8 (refuse/recycling)  in respect of sites 1, 4, 7 and 9  
of application dated 22/03/10, ref: PA/09/2065 (Deadline" 10th January 2011) 
Consequently there should be no works on new build sites other than demolition and the digging and completion of foundations.  Which includes starting to build above the ground - as is happening in the photograph below - taken this morning from Ennerdale House looking down at Site 1.

Does the Site Manager know what has to happen before building can commence we ask ourselves?

Maybe our local Councillors who are also Eastendhomes Board Members would like to raise a councillor's query about why the Council keeps being ignored by the Contractor appointed by the Board breaches continue to happen?

Tuesday, 14 December 2010

Demolition - the movie (aka Telford Homes breaches planning conditions yet again!)


I don't think we need to explain this one too much.  Telford Homes plc are obliged to use appropriate controls to keep dust on the Eric & Treby Construction/Regeneration Site to a minimum

We don't see any controls at all.  Do you?

So that's another email from MERA to:
  • Andy Osbourne - the EastendHomes Project Manager
  • Jen Taylor and Okey Nkoka at LBTH Environmental Health (re environmental / health and safety concerns)
  • Richard Murrell and Thomas Doyle at LBTH Planning (re breach of planning conditions) 
  • Paul Hems at the HSE (re quality control of the site from health and safety perspective)
  • Edward Hardy at the Considerate Contractor Scheme. (re a complaint about this site)
  • Mile End East ward councillors - who are also members of EastendHomes Board - whose duty is to look after the interests of local residents
It will contain a link to this blog post and YouTube video.

Keep an eye on the new Flickr set in which we will be putting all the photos we take of breaches of planning conditions on site 15.

Tomorrow - the story of the demolition of site 10.  Finally the contractors realise they've been photographed for the last two weeks.........

Monday, 13 December 2010

Ennerdale House Rubbish problem continues

The skip situation at Ennerdale House Thursday 9th December 2010
OPEN LETTER TO: Tower Hamlets Council, EastendHomes and Telford Homes plc

The problem with waste collection from Ennerdale House is still a very long way from being resolved.

The MERA Chair started reporting this problem with waste at Ennerdale House to FixMyStreet at the end of October and subsequently to the Mile End Estate Management Board.

We started reporting the problem to you on this blog (which we know you all read) on 13th November and via contact with the council and councillors.  A month later, if anything the situation is getting worse.
  • Putting rubbish in the chute is NOT a long term solution!  
    • When are you going to get to grips with the fact that the skip will be totally out of commission as soon as Telford start building at the base of Ennerdale House?  
    • Where exactly do you propose to collect the non-recycling waste which is currently going down the chute?
  • Why have you as yet not provided a place for people to put their large bags of non-recycling waste from normal large kitchen bins - as seen in every kitchen supplies shop in the country and an awful lot of kitchens in Ennerdale House?  This is the rubbish which will not go down the chute.
It's been suggested that maybe residents should start dumping their rubbish outside the offices of EastendHomes and/or Tower Hamlets Council.  After all this couldn't possibly be an offence as obviously both EastendHomes and Tower Hamlets Council are perfectly content for rubbish to be left for days and days outside the front door of Ennerdale House!

I wonder if the solution might be delivered a bit sooner if we did start doing that?

In the meantime we'll be pursuing the progress of our complaint about this current state of affairs.  Ombudsman here we come!

Regards

Mile End Residents Association

PS  We've had a very nice letter from the Considerate Contractor Scheme and hope to meet with them shortly about the conduct of and project management by Telford Homes.  We'll be sending them links to all the evidence of the extremely poor management of services such as waste management during this regeneration project

More reports to those that should be sorting this out 

    MERA will be reporting the current state of affairs to:

    • local ward Councillor Rachael Saunders and Councillor Motin Uz-Zaman - who are also Board Members of EastendHomes
    • Tower Hamlets Council's Waste Management Officers
    • Tower Hamlets Council's Planning Officers
    • Tower Hamlets Environmental Health Officers
    • the Considerate Contractor Scheme - with a recommendation that the label be taken away from Telford Homes
    • the Health and Safety Executive for London (Construction Sites) 

    We will of course continue to monitor and photograph the situation and report all problems to FixMyStreet - for all to see.  Photographs are now being taken on a daily basis.

    Links to all previous posts about the problems with rubbish collection at Ennerdale House:

    Thursday, 2 December 2010

    Demolition Assistance from Tower Hamlets Environmental Health Team

    Yesterday MERA learned two things

    1.  Tower Hamlets needs to protect buildings in Conservation areas as well as design!

    First, Tower Hamlets Planning needs to address a major deficit in its practices in relation to protecting Conservation Areas.
    Unfortunately the approved construction management plan (condition 5) of the planning permission granted does not have control over the effects of vibration and potential for damage to neighbouring properties resulting from the demolition process. You are correct in taking the matter up with environmental health.
    It would seem that Planning is more interested in the design impact rather than whether the buildings are maintained in good order while demolition and construction takes place!

    Some questions:
    • What on earth is the point of Tower Hamlets Council having a Conservation Policy for its heritage if buildings are going to be shaken severely due to very poor demolition practice by the contractor?
    • WHY does the Construction Management Plan not offer adequate protection to nearby buildings in a Conservation Area?
    • WHY does the permission for demolition affecting buildings in a Conservation Area not have planning conditions which outlaw the type of adverse outcomes which result from poor demolition practice?
    • What's the point of having a Council planning function if developers can do what they like?
    2.  Tower Hamlets Environmental Health continue to be very helpful!

    The Health and Environment Team personnel which MERA spoke to yesterday were very helpful in providing support for the local residents and the Mile End Residents Association.

    Environmental Health officers continue to assist with the very poor practices being adopted by the demolition contractors employed by Telford Homes (see Demolition starts - and so do breaches of controls for an earlier example of poor practice)
    • The Telford Homes Construction Director was contacted very quickly and the problem explained.  MERA understands he was planning to make a visit to ensure there were no repeat offences.
    • Vibration machines have been offered to homes in block severely affected by the impact vibration from demolition on the Brokesley Street site in order to the record the extent of the impact vibration should it continue
    To date, demolition practice seems to have improved and there has been no reasons to contact Environmental Health to make an appointment for the installation of the vibration machines.

    We hope by now that both Telford Homes and the Construction contractors have learned that MERA will not put up with any poor practices when demolition is occurring.

    Should poor practice continue in relation to demolition practices MERA will again be contacting the Health and Safety Executive (London - Construction sites).

    Wednesday, 1 December 2010

    Telford Homes Demolition shakes buildings in Conservation Area


    The demolition of 1-14 Brokesley Street by Telford Homes started yesterday.

    The impact vibration from the demolition is currently causing serious concerns for the wellbeing of the building at 644-648 Mile End Road which is connected to 1-14 Brokesley Street via party walls

    Impact vibration caused by the method used for demolition is causing the 1848 building to shake significantly and concerns are being expressed about the risks to the original plaster ceilings.

    We thought Conservation Areas were supposed to protect our heritage and health!

    Planning and Environmental Health have both been contacted as has Cllr Rachael Saunders, who is both the ward councillor and a Board member of EastendHomes who are responsible for the development.  Let's see how long it takes to get some action to prevent this irresponsible approach to old buildings in this Conservation Area.

    The yellow arm of the digger machine being used to demolish the flats at 1-14 Brokesley Street.
    This is being dropped from a height onto the roof and causing 
    very significant vibration to the building siuated on Mile End Road 
    which is connected to the flats via party walls
    The party wall between site 10 and St Clements Hospital was the subject of 
    a Conservation Act planning application to allow access for the digger


    The simplest solution would seem to be that the connection between the two buildings must be removed as soon as possible.

    This means the demolition of the end wall of 1 Brokesley Street needs to be executed as soon as possible to separate it from the party wall and thus disconnect the significant level of vibration.


    LinkWithin

    Related Posts with Thumbnails