Saturday, 20 November 2010

Telford Homes: The noise from pile-driving

This is a video which illustrates what the noise from pile-driving by Telford Homes is like for people living right next to it.

This video is taken from Ennerdale House and shows operations on the Southern Grove (east) side of Ennerdale House, on the EastendHomes' Eric & Treby Estate in Mile End.

This is just one side.  Soon Ennerdale House will have noise like this on all four sides.



Tuesday, 31 August 2010

Telford Homes' proposed access to Site 7 - Tonka Trucks anybody?

MERA Chair Mark Taylor demonstrates the width of
the proposed access to Site 7 on the Eric & Treby Estate redevelopment
The Revised Construction Management Plan (part of planning condition 5) indicates that this will be the access route for all construction traffic needing to get to Site 7 (the open space fronting on to Burdett Road and next to the Tabernacle Church).

This view is taken from Open Space 5 (the tarmac space between the Tabernacle Church and the Eric Street maisonettes/gardens) looking north.  Note the width!
  • slightly more than Mark's outstretched arms
  • about the same as a wheelie bin!
MERA understands that Telford Homes will be downsizing their trucks.  Presumably this is when Tonka Trucks make a reappearance on the local scene? ;)

Yes, you've guessed it!  MERA will be highlighting this traffic access proposal as part of the MERA response to the revised traffic access management proposals which form part of the revised Construction Management Plan.

Consultation closes tomorrow - 1st September 2010.

[UPDATE #1 - We've had discussions with the Tabernacle Church whose rear wall is indicated on the left in the photo.  Apparently the Church was approached 10 weeks ago with a request to knock the wall down.  A meeting has been held with advice taken from a party wall surveyor and the Tabernacle are declining to knock down their wall.  The wall has been there for over 50 years and encloses a necessary turning space for vehicles visiting the church. 

UPDATE #2 - The Tabernacle Chuch have now queried access with Telford Homes.  The Construction Director Jeremy Brett,  is now indicating that there is no current plan for a way into the site and that they will have to find another way in.  Which of course is NOT what is indicated by the designated route plan nor the route instructions for Site 7 (see page 13 for route instructions!) in the Construction Management Plan which is currently out for consultation.  This is what preciptated our discussions with the Tabernacle and their discussions today with Telford Homes.

Where next we wonder?] 

Wednesday, 25 August 2010

Proposed Construction Management Plan - version #2

The revised version of the Construction Management Plan for the Eric & Treby Development has been posted on the Council's planning database and individuals who have noted their interest in this development have now received letters about the consultation process
PA/10/01572 : Submission of details pursuant to condition 5 (construction management plan) of planning permission dated 22nd March 2010, reference PA/09/2065.
The deadline for responses is the 1st September. 

MERA will be reviewing the new proposals in detail.

To date we have noted:

MERA asked for:Submission includes?
Much more information about traffic access and circulationYES
Details of planned routes to and from each individual numbered construction site and numbered landscape site which:
  • meets health and safety requirements and 
  • recognises the existence of a large number of children on the estate
Appendix 3 provides details of planned Delivery Route Vehicles.
 
Reference is only made to numbered construction sites and omits any reference to all numbered landscaping sites despite the fact that removal of earth and delivery of new landscaping materials will involve considerable site traffic - as has already occurred. 
Details of all planned parking bay suspensionsAppendix 4 provides a plan of parking bay suspensions.
Details of all Hoarding having an impact on pedestrian Traffic and measures to provide adequate separation of pedestrians from construction traffic which meets health and safety requirements and recognises the existence of a large number of children on the estateNO
Appendix 2008 plans re development submitted indicates fencing associated with the completed scheme and proposed landscaping. 

The legend provides no indication of how hoardings are represented on the site plan.
Details of how the Grade 2 Listed Piers and Gates into St Clements Hospital were to be protected from accidents with construction vehicles due to the very tight turning circle for construction lorries.Appendix 9 Provides drawings of the St Clements Hospital Pier Protection Plan. This includes creation of concrete bollards, hoarding and removal of the iron gates to a place of safety during construction.

This work has now gone ahead in advance of the approval of the CMP.
Improved communication with residentsNO
Proposals are inadequate as will be evidenced in the MERA response.
Better management of noiseNO
Exclusion of all EEH traffic associated with other developments from the site due to near accidents generated by drivers of such vehiclesNO 
Schedule of Works (Timeline) for all numbered construction sites and all numbered landscaping sitesNO
Furthermore the timeline for the deliveries and removal of waste works contained in the Construction Management Plan assumes a one site development - not a complex set of sites which are coming onstream at different times

There is also no recognition whatsoever of the fact of the existence of another major contract on the Estate identified as part of the original planning application. 
Explanation of how the contract for the works relating to new buildings is going to work alongside the separate contract for to achieve decent homes standards - as identified in the original planning applicationNO RECOGNITION OF THE SECOND CONTRACT and associated movements of goods (ie kitchens and bathrooms)

Monday, 9 August 2010

Parking suspensions and access: MERA wants better communication

9th August 2010: 
Suspended parking and road works in Brokesley Street

This is an extract from a letter we've sent to the officers of Tower Hamlets Council asking about matters relating to the suspension of parking bays in Brokesley Street.

We've also separately asked Planning to provide some reassurance about the quality of the liaison between Parking and Planning in relation to development works.

Let's see what they have to say......
Could you please answer the following questions:
  • Normal notice period for all planned utility work:  What is the standard notice period given to local residents for suspension of parking bays due to planned works by utility companies?
  • Notices - allowance for summer holiday period:  What is the normal notice period given to residents about suspensions of parking bays during the summer holiday period when people are likely to be away on holiday?  (We would regard at least 14 days for all planned works as an acceptable standard)
  • Application date:  On what date did you receive the request from Transco for the suspension for planned development works in connection with the development of site 10 of the Eric & Treby Estate development
  • Works to comply with Council Planning Permission/Conditions:
    • Were you aware that the planning permission for the development at site 10 of the Eric & Treby Street development requires that the Construction Management Plan MUST be approved before any development works can take place? 
    • Did you check to see whether the development had complied with all pre-commencment planning conditions and developmnents works could proceed BEFORE you granted permission to suspend the parking bays.
  • Adequate Notice: 
    • On what date did council officers fix the notices and mark up the pavement relating to the suspensions of parking for this planned work in the street?  
    • Did this comply with the standard notice period required before planned works by utility companies can commence?
    • Why did local residents not receive a letter as we have done in the past for lengthy suspensions of parking in most of the road?
    • Why did the notice not state what would happen to cars which remained and how much it would cost to retrieve them?
  • Customer Services/Queries:  Why did the suspension notice not provide a telephone number for queries?
  • Customer Service/Comunication:  Why did the suspension notice not say which organisation had requested the suspension?
  • Hours of working in residential areas:  When granting permission for the suspension of parking
    • Do you require limitations on hours when works/noisy works can take place? 
    • Do all utility works relating to a developent need to be compliant with standard hours for constructions works in residential areas imposed by the Council re planning applications?  (eg no works at all before 8am)
    • For the record works had started in Brokesley Street BEFORE 8am this morning (breaching Planning Condition 14) and a very noisy machine (requiring ear protection for the operative) was being used between the hours of 8am and 8.30am (apparently breaching Planning Condition 15 which limits noisy work to between 10am and 4pm). 
  • Liaison:  Are you satisfied that Highways/Parking Services Liason with the Planning/Development Control is adequate for the purposes of ensuring that all suspensions of access to streets and pavements for the purposes of necessart works associated with a development ONLY takes place in complete compliance with the Council's planning conditions?
Our principal aim in writing to you is to AVOID any repetition of:
  • lack of adequate notice to local residents about parking suspensions
  • lack of adequate communication with residents as to who to contact in relation to the suspension of parking
  • avoidance of any fines being levied on any resident who has not received adequate and approrpriate notice
  • apparent lack of awareness by Parking of the terms of the planning permission and pre-commencement planning conditions
  • works which do not comply with the terms of the planning permission (eg unapproved works prior to the approval of all pre-commencement planning conditions)
  • specifically impact breaking and noisy work outside the hours as stipulated in planning condition 15 of the Decision Notice for this development
We also want reassurance that proper consideration will be given to the requirements for 24/7 emergency access and disabled access EVERY TIME parking bays are suspended for holes to be dug in the road during the course of this development

No noisy development work before 10am unless you're Transco?

Eastendhomes Site 10: Gas works in Brokesley Street
This morning Transco started work relating to gas supply right outside Site 10 in Brokesley Street before 8am.  This involved use of noisy machinery well before the 10am start date which is a condition of all noisy works associated with the redevelopment. 

This work is connected to the EastendHomes development being undertaken by Telford Homes although being undertaken by a utility.  As such to our mind it's covered by the planning conditions for the development for hours of work and that relating to noisy work .
CONDITION 14 - Construction Hours Building works must only be carried out between 8am and 5pm Monday to Friday and 8am to 1pm on Saturday.  No works can be carried out on Sunday or Bank Holidays unless agreed by Council in writing.

CONDITION 15 - Piling and Impact Breaking Hours: Hammer driven piling and impact breaking only to be carried out between the hours of 10am and 4pm.  Not allowed on Sunday or Bank Holidays unless agreed by Council in writing
However the worker concerned felt the need to wear ear defenders while using noisy machinery immediately outside 1-14 Brokesley Street to damp down and seal the tarmac which was laid before 8am.  This photograph was taken a few minutes after 8am.

What a pity he didn't have similar consideration for the residents of Brokesley Street!

Today MERA will be:
  • reporting this infringement of planning conditions to Tower Hamlets Planning Enforcement
  • asking Tower Hamlets Planning why any of the utility works associated with this development are being allowed in advance of the approval of the Construction Management Plan
  • asking Tower Hamlets Highways / Planning asking why permits to close streets are allowed which then lead to works before 8am. 
  • asking Transco why planned works (ie non-emergency works) are being done at anti-social hours.

Thursday, 29 July 2010

Construction Hoarding blocks view of Southern Grove, London E3

Below is the text of a recent report to FixMyStreet.  MERA will be forwarding a link to this blog post to the
Hoarding blocks view of road
Reported in the Roads/highways category by Martin Peter Donkin at 21:21, Wednesday
Sent to Tower Hamlets Borough Council 4 minutes later


The hoarding erected on the corner of Hamlets Way and Southern Grove (north) blocks view of the road. When attempting to turn left from Hamlets Way onto Southern Grove I cannot see if there are any oncoming cars. Oncoming cars will be in the middle of the street due to the other parked cars. As a cyclist, I am a vulnerable road user and I feel that this junction is particularly unsafe. Either the car parking near the junction should be suspended or the hoarding needs to be relocated.

Hoardings are FINALLY displaying licences

Further to our earlier posts about the Construction Site Hoardings and the lack of any display of a licence, we noted this week that the hoardings at Site 12 and 14 suddenly sprouted licences earlier this week.

This is what a Hoarding Licence looks like.  It should clearly state the name of the developer, the Street name and the length and width of the hoarding.

Hoarding which cover nearly all the pavement should also have lights and a safe passage for disabled people.

If you don't see a licence for a Hoarding clearly displayed AT ALL TIMES you can Report an obstruction to the road or pavement online.

See other comments about Hoarding in:


Wednesday, 21 July 2010

Do you want to comment on details of the Redevelopment?

It would appear that certain individuals who really ought to know better are suggesting that local people should not be speaking out about aspects of the redevelopment of the Eric & Treby Estate.

More specifically they are very unhappy about MERA speaking out about the infringements of planning permission and the unlawful development of sites before all the pre-commencement of construction planning conditions have been satisfied.

Let's be very clear about this

the Council's consultation is with the public
all planning applications are public
ANY LOCAL RESIDENT CAN COMMENT

Now it's clearly the case that not everybody will have the same perspective however that's fine.  The Planning Officers will consider all representations and comments and decide which are relevant and which are not.

The important thing is for local people to hold organisations which are responsible for our homes and environment to account for actions they propose taking.  We SHOULD comment if we feel what they say is wrong. 

That's what you do in a democracy.  
It's the British way of doing things and long may it continue!

Three more applications for approval of details have been published

These can be accessed via the website or via the Redevelopment page of this blog where we keep track of all the various applications and their current status.  These are:
  1. CONDITION 18a - Energy Efficiency: PA/10/01395 - Approval of Details - comment deadline 5th August 2010
  2. CONDITION 4 - Service and Delivery strategy:  PA/10/01352  - Approval of Details  comment deadline 5th August 2010
  3. CONDITION 28 - Visibility splays:  PA/10/01396 - Approval of details comment deadline 5th August 2010
The deadline for comments is 5th August 2010

Remember!
Consultation is with the public
ANY LOCAL RESIDENT CAN COMMENT


If you want to be kept updated why not subscribe to this blog.    
ou can do this by clicking the link below
Subscribe to MERA - Mile End Residents Association Blog by Email

MERA comments on Foul and Surface Water "Scheme"

Tower Hamlets Planning now have MERA's comments on Telford Homes' proposed "Scheme" to address Planning Condition 21 relating to the disposal of Foul & Surface Water from new residential units on the Eric & Treby Estate redevelopment. 

Just so everybody knows what we're talking about....

  • Foul drainage removes the waste from the toilet, bath, basins, sinks, washing machines, dishwashers and showers. 
  • Surface water drainage deals with rainfall as it collects around a property (eg roofs, gutters and land) 
Planning Condition 7 (application for approval not yet submitted) deals with the required scheme of water and sewerage infrastructure delivery for the whole development.  In short whether the existing water supply and sewerage system can cope with delivering an effective supply of drinking water and the disposal of waste water and sewerage (ie what needs checking before any homes can be occupied) 

Planning Condition 21 deals with the micro site level aspects (pipes and connections required and planned)  and is worded as follows
Prior to commencement of the development, with the exception of site investigation works and the digging of foundations, a scheme to dispose of foul and surface water shall be submitted to and approved in writing by the Local Planning Authority.

The Development shall not be carried out otherwise than in accordance the particulars so approved.
Reason: To protect and conserve water resources and to prevent increased risk of flooding and pollution of the water environment in accordance with:
  • policy 4A.16 of the London Plan (Consolidated with Alterations since 2004),
  • policies U2 and U3 of the Unitary Development Plan 1998 and
  • policies DEV5, DEV7 and DEV21 of the Interim Planning Guidance (2007): Core Strategy and Development Control.
Summary of MERA Comments

MERA consider that this Application fails to satisfy as to the adequacy of arrangements for foul water and surface water drainage at a specific site level.  It is inadequate for the purposes of discharging this planning condition.

REASONS INCLUDED:
  • This pre-commencement planning condition has already been breached at Site 14 through unlawful development in advance of the discharge of ALL pre-commencement planning conditions.  Note the drains and manhole covers in place on Site 14 on Monday evening - when the consultation did not even finish until today.
Drains and Manholes - development contravenes planning permission/conditions

  • A Scheme is a plan of action. A Scheme requires explanation. A set of drawings is not a Scheme.  Drawings support the narrative text of a Scheme, they do not explain it.  PA/10/1159 is the application for approval of details PRIOR to commencement of the development.  If you click the link in the Application Reference you can see the quality of the documentation submitted.
  • The application for approval of details fails on the grounds of accessibility for the purposes of consultation.   Technical drawings and no report renders this application completely inaccessible to most people.
  • The Scheme does not revisit issues raised in the Flood Risk Assessment Scheme - as recommended in that report.  
  • The Scheme for Site 10 fails to indicate how the drains connect to the main sewer.  However, in doing the research to respond to the proposal we have identified a probably reason why Brokesley Street has problems with drainage.  This is because the main drain under the road is only 300mm wide according to the documents submitted, making it the smallest drain in the area by quite some way.  It's very unlikely that Planning Condition 7 (Water and Sewerage Infrastructure) which covers capacity issues can be satisfied without a comprehensive review of what a 500+% increase in people living on Site 10 will have on the rest of Brokesley Street given the tiny size of the drain.  We will be keeping a very careful eye on this issue which generated several comments from local residenrs during the course of consultation.
As noted in section 3.1.2, there is a residual risk of sewer flooding as a result of the increase in foul sewerage requirements for the new properties on the site.
Flood Assessment
  • The Scheme fails to demonstrate any awareness of the implications for pipework underground  resulting from remarks about and recommendations arising from the Expert Report on Site Contamination.   (see Eric & Treby Estate: Site Contamination)  The nature of the contamination requires protective sleeves for the pipework underground to avoid any contamination transferring into the water.  
  • The drawings give no indication to the layman of how greywater is captured for recycling - which contravenes planning policy as well as being very silly if no effort is being made! 
  • This "scheme" gives inadequate consideration to how surface water drainage will change following the soft landscaping.    
The risk of surface water flooding to and from the development will be increased as a result of the conversion of permeable to impermeable land cover.
Flood Assessment
MERA considers that the nature of concerns raised by residents (particularly those near Site 10) means that these need to be adequately addressed by the developer
  • BEFORE submitting a Scheme for the disposal of foul water and surface water
  • BEFORE the proposals for meeting this planning condition can be approved; and
  • BEFORE the planning condition can be discharged
________________________________


If you want to be kept updated why not subscribe to this blog.    
You can do this by clicking the link below 
  Subscribe to MERA - Mile End Residents Association Blog by Email

Tuesday, 20 July 2010

BREACH of Condition 5 Construction Management Plan

Last week, Planning Enforcement stressed to Telford Homes plc the utmost importance of getting a Construction Management Plan approved for the development on the Eric & Treby Estate as soon as possible.

Planning also closed two of the sites because of unlawful development in advance of the satisfaction of the Council's pre-commencement planning conditions for the Estate redevelopment

Saturday, 17 July 2010

Multiple Power Cuts in Mile End still unexplained

Buildings in and around the Eric and Treby Street Estate have been suffering a number of power cuts for the last four weeks. 

We think there have been four in total.  They've started since Telford Homes plc have been on site and plugging in to the Estate electricity supply - although this may be coincidental. The last one was on the night of 14th-15th July.

Thursday morning 8:30m
EDF Energy plc's big hole on the corner of Eric Street and Hamlets Way

Night of 14-15th July

This is the sequence of events for the latest power cut - as recorded by Mark Taylor, the Chair of MERA, and other residents on the 17th floor of  Ennerdale House.

DateTimeWhat happened
14th July22.00Power out to all flats (on 17th floor): 
  • No Lifts
  • No Drinking Water Pump. 
  • No phones where electricity required for operation.
Emergency Lights on landing and stairs: lights dimmer than usual but OK.
22.30MERA Secretary reports to EDF Emergency Line
EDF say they could see a fault on the system - probably a fuse in a sub station on Southern Grove.
Engineers called but could not give ETA of power supply.
15th July01.41EDF log: Job was reclassified from "fuse" to "underground network fault".  Engineers attempted work around (?) at LB6 (Link Box 6)
02.00ish17th floor:  power came back on temporarily
03.09 EDF log:  Engineer reports verbal abuse from member of the public while attempting to use "sniffer"
04.31EDF log:  Power returned
05.30Chair of MERA called EDF emergency line to find out reason for power cut.  They could not say but suggested he call back later.
05.40Chair of MERA called LBTH emergency service and reported lift serving odd floors still not working and lack of water to pump not working.  (The pump needs to be restarted after every power cut and any air block cleared before water pumps to top floors.)

Told this would be fixed by midday (ie 14 HOURS AFTER WATER LOST).

06.50Water back on to top floors of Ennerdale House. 
08.303 EDF engineers on Hamlets Way probing the pavement with device and taking notes on clip board.  They said they were still investigating fault and may have to cut power again - but not to Ennerdale.
09:00Power to Ennerdale House went off again!

EastendHomes posted this letter (see below) to residents of Coniston House, Ennerdale House, Beckley House, Windermere House and Derwent House

However it needs to be noted that the fault also affected the private houses in Eric Street as well.


Two important points:
  • EastendHomes and/or its agent LBTH Emergency Service are responsible for supplying drinking water to ALL HOMES which are without drinking water supplies as a result of the pump not working.  
Thames Water are obligated to arrange for an alternative supply, such as by water tanker or standpipe, they cannot put your supply back on within 6 hours of the interruption.  The same standard should apply to EastendHomes if a pump is not fixed and water supply restored to all tenants and leaseholders within 6 hours.
  • Since the fault (and associated power cuts) has only started happening since Telford Homes has been on site, EDF Energy, EastendHomes and Telford Homes plc need to make sure - as a matter of priority - that the fault is not caused by anything that Telford Homes have done when digging holes and plugging into the network supply.

Tip:  Until such time as there is an adequate explanation of what the fault is and confidence that it has been fixed we suggest that you keep a stock of drinking water at home which is adequate for 6 hours - especially if the weather is hot and you have small children.

Thursday, 15 July 2010

This construction site is UNSAFE!

Next week the schools break up.  There will be small children playing all over EastendHomes' Eric & Treby Estate - in the middle of what we currently regard as an unsafe construction site run by Telfords Homes plc .

Yesterday, we found the gates to the site compound at the base of Ennerdale House to be wide open.  Inside was a large construction vehicle and contaminated ground which has been broken up.

So we took a photograph of the vehicle.........


 .....and the wide open gates to the site at the base of Ennerdale House.....

but then the driver spotted a MERA rep. with a camera (yet again) taking yet more photographs of things that are not as they should be.

Of course we wouldn't need to take photos of a site which was meeting all the Health and Safety Regulations for Construction Sites - but this one doesn't.......



..........and at this point the driver decided it might be a good idea to close the gates


Those would be the ones with the sign which 
clearly says "children must not play on this site" 
when the gates are closed!

We've made the point repeatedly to the Council that this site - as currently run - ignores planning permission, planning conditions, health and safety regulations and is UNSAFE.

This morning, we've invited the Council to consider again what they need to do to make with this site safe BEFORE the schools break up - next week.

Wednesday, 14 July 2010

Highways #2: This parking bay is NOT suspended

Yet again, MERA needs to remind EastendHomes and Telford Homes plc that NONE of the roads on the Eric & Treby Estate are Estate Roads

Site 12 English Street: Illegal use of constructors' barriers to prevent parking 
in a Tower Hamlets Council residents only parking bay

The obstacles in the above photograph are illegal.  This is what it says on Tower Hamlets website about obstructions to roads and pavements
Obstructions to roads & pavements

It is illegal to obstruct the road. If somebody unlawfully assumes ownership of areas of a road, they are breaking the law. If a person, without lawful authority or excuse, in any way wilfully obstructs the free passage along a road, they are also guilty of an offence.

In such cases the council, as the highway authority, has legal powers to enforce their removal.
Only Tower Hamlets Council can suspend one of its own parking bays.  Suspending parking bays cannot be accomplished by a third party putting large obstacles - such as constructors' barriers in the bay. 

A parking bay is also only suspended IF it is displaying a copy of the notice citing the relevant legislation and contact details.   The only way a parking bay can be suspended at short notice is if it's for an emergency (eg a gas leak) which requires, for example, utility vehicles to attend.  Short notice suspension does NOT apply to planned building works.

The Tower Hamlets website also says

Any building materials that block the pavement cause an obstruction to pedestrians, and are potentially dangerous. If you encounter any of the following problems please report them using our online form:
  • skips / scaffolding / advertising boards blocking the pavement
  • no barriers around street works / roadworks
  • banners or bunting causing an obstruction, or
  • any other building materials blocking the pavement, or building work that is endangering pedestrians.
Hoarding has been erected without any display of the required licence and without any consultation with residents and tenants as to the impact on local people including those with disabilities.

All works on the Eric & Treby Street site should proceed according to a shedule which should provide adequate time to apply for the appropriate licence and communicate with residents as to what is planned - allowing sufficient time for residents to make comments and plans to be revised accordingly.

Construction Management Plan and Consultation with Local Residents

One of the reasons why the Construction Management Plan was REFUSED was because of the inadequate consideration given to the management of site traffic, the separation of pedestrian routes from the site works and the general health and safety of local residents.  MERA has been highlighting causes for concern to Planning every week.

Planning have confirmed to MERA that EastendHomes agents need to submit another Construction and Management Plan for approval BEFORE any works above ground can commence on ANY of the sites.

Such a plan will be subject to consultation with residents.

MERA will be encouraging residents to write in and comment on the handling of matters relating to site traffic, parking bays and pavements during the consultation period.  

It's also very likely that we will also submit a petition - so watch this space!

IF YOU SEE CONTRACTORS OBSTRUCTING ROADS OR PAVEMENTS 
PLEASE CONTACT MERA ON THE MERA HOTLINE No 
(talk or text) 07932 626340

Highways / Traffic Management - see also:

Highways #1: Vehicles with no parking permit

Parking Infringement: Telford plc's vehicles 
parked in Residents Parking Bay at 8.30 this morning

Somebody at EastendHomes / Telford Homes plc needs to wake up to the fact that NONE of the roads on the Eric & Treby Estate at Mile End are "estate roads".   They are all roads which have been adopted by the Council. 

Registration No. EU56 GUJ
parked in Residents' permit holders only parking bay at 8.30am

This means that:
  • all the normal highways and parking regulations apply.
  • Telford Homes needs to comply with Tower Hamlets "rules" not EastendHomes "rules".
  • the only vehicles which can be parked in "residents permit holder only" parking bays are ones which (1) belong to residents and (2) have a residents' parking permit or (3) are using a scratchcard of the type made available only to residents (ie for works organised by residents). 
  • Non-residents without a residents' scratchcard and commercial vehicles cannot use residents parking bays.
There was no evidence this morning that
  • this parking bay has been suspended (ALWAYS very clearly marked by Highways - there was no notice under the permit sign and no visible evidence on the pavement that the parking bay was suspended between fixed points).
  • The Dumper Truck (Vehicle Registration No EU56 GUJ) had a parking permit.
We're going to
  • send a link to this blog post to Tower Hamlets Parking Services. 
  • have a word with Highways.

    Tuesday, 13 July 2010

    Unacceptable Brick proposed for Brokesley Street (site 10)

    MERA has been trying to see what the materials proposed for the various Eastendhomes newbuild sites actually look like for quite some time. 

    In fact ever since consultation started in April on PA/10/00720 relating to condition 10 (material samples) and the request to vary the materials to be used for NEW BUILD at Site 10 (Brokesley Street), site 12 (Beckley House), site 14 (Ropery/Eric Street) - on the Eric & Treby Estat.

    Below is the schedule of proposed materials for Site 10 (right click to see a larger version).  Links in the brick names below are to the photographs of the specific brick as part of the Site Materials Set on the MERA Flickr account.


    Our initial conclusions were that the proposed brick for Site 10 in Brokesley Street (Ibstock Funton Orchard Mix was unsuitable as it was far too red.  It failed to reflect the yellow London stock brick used for the nineteenth century houses opposite and the terraced houses on the eastern side of the street - next to the site of the proposed new family houses.

    This was stated in MERA's formal response to the planning application (see below)  We also asked to see a better presentation of the building materials.
    Site 10 Brokesley Street:    The suggested brick Ibstock Funton Orchard Mixture (no stock code listed but stock no. 4051 ) is unsatisfactory as it does not appear to us to provide a close match to the brick of the adjacent maisonettes or the (cleaned) houses opposite ALL of which are built in a brick with a distinct yellowish cast associated with London Stock. Based on the sample brick supplied, it appears to have much more of a reddish cast. Google also says there is no such thing as Funton Orchard Mixture 4051. We were also unable to identify the brick proposed on the manufacturer's site. We haven't been able to identify any buildings or see any photographs of buildings which have used this exact brick (bearing in mind there are several with similar names). 

    In order to avoid mongrelisation of the street ("any old brick will do") we'd want to see a brick being used which provides a good match with the predominantly yellow London Stock bricks in the street. The 1960s development sought to have bricks which 'fit' with the Victorian Buildings and the new "pastiche" houses need to do the same.  We've managed to identify a brick on the Ibstock site which appears to us to look a lot more like the brick used in Brokesley Street - this is Ibstock Funton Orchard Mixture - Yellow. (ie the critical word is Yellow!) The Stock ID is 4211 . 

    We'd be interested to know English Heritage's views about the proposed bricks
    MERA response to PA/10/00720 (materials)
    After waiting for some weeks, two small brick walls have appeared in Brokesley Street and we can now show you what one of the proposed materials look like.  However......
    • The walls are not labelled in any way.  
    • No information is provided as to how residents can comment on the proposed materials.

     The brick on the left is Ibstock Funton Orchard Mix.  It is WRONG and UNACCEPTABLE
    The brick on the right is Danehill Yellow Facings.  This is a reasonable match - and is acceptable

    However the two walls have demonstrated very clearly the point we made in response to the application for approval of details re planning condition 10 (site materials)


    Brokesley Street forms part of the Tower Hamlets Cemetary Conservation Area.  The priority for the street is a development which is sympathetic to the houses which have contributed to this area being designated a Conservation Area.  The residents of Brokesley Street do not want bricks which look out of place.

    BOTH of the existing terraces are built in a traditional yellow London Stock brick.  (see the photo of the bricks on Lincoln House opposite)

    The bricks for the new houses MUST be a good fit with
    • the existing brick of the terrace of early Victorian houses on the west of the street and 
    • the terrace of 60s houses on the east side of the street.  

    Thus the proposed brick - the Ibstock Funton Orchard Mix is totally UNACCEPTABLE.  It has the appearance of a reddish fletton brick.

    The Danehill Yellow Facings brick appears to be a much better fit and a more acceptable brick.

    The proposed brick for the string course is Ibstock Atlas Smooth Blue. In principal this is a good proposal given the string brick used in the Hanover Court entrance and building opposite Site 10. It looks like it might be a good fit. However we have still not seen in this brick in situ.

    Entrance to Hanover Court development - opposite Site 10, Brokesley Street
    dark grey/blue bricks used for string course

    What you now need to do

    We suggest the residents of all the properties in Brokesley most affected by the choice of bricks for Site 10 should now write and comment on the proposals.

    You can:
    • either contact the Planning Case Officer Richard Murrell in writing ie his email is his name with a dot in the middle plus @towerhamlets.gov.uk  (I'm not writing it in full to avoid him being swamped with spam!)
    • or you can leave a comment on the website for the particular application - follow this link and then write your comments where it says "Make a general comment."

    Friday, 9 July 2010

    MERA is now watching Site 12 in English Street

    EastendHomes propose to create four affordable homes (3 beds x 5 persons) on the land adjacent to Beckley House and 2-26 English Street.  This is known as Site 12 within the Eric and Treby Street Estate redevelopment.

    Yesterday Telford Homes plc were busy erecting the posts for the site hoarding - see the photo below.  As you can see they clearly come to the edge of the pavement which means that there are obviously plans to STOP residents from walking along that part of the pavement.


    Now to have hoarding which disrupts pedestrian flows you need to have a Hoarding Licence. The Site Manager asserts that they have one and will be displaying it in full view when the hoarding has been erected
    Our priority is to have a safe neighbourhood for the duration of the redevelopment contract.  In particular to make sure that the site is SUPER-SAFE for children during the upcoming school holidays.  
    Consequently MERA is:
    • checking with Tower Hamlets Council what plans have been submitted for compliance with the conditions for having site hoarding and the movement of pedestrians including children
    • checking with the Highways department whether there have been any proposals to suspend the parking bays immediately outside the site to create a pedestrian walkway for those people
    • expecting that ALL provision for the separation of site traffic from pedestrian traffic complies with requirements to make the public highway accessible for disabled persons who need carriageway crossovers to get up and down pavements.
    The Council's website clearly states the following
    Scaffolding and hoarding licence

    When carrying out any building work, maintenance, or removing part of a property next to a public road, pavement or rear lane, the safety of people on the road is paramount.

    You must provide safe areas at ground level or a platform at high levels. When it is necessary to place hoardings on the road/pavement around the place of work or scaffolding, you need to obtain permission from the council by completing a form together with a sketch. If you get permission, please read it carefully and make sure you adhere to all the conditions of the licence.

    Basic requirements

    Hoardings:
    • Must be a minimum of 2.5 metres high and able to withstand high winds
    • Must have illumination
    • Must have a smooth finish with no protruding parts
    • Must have pedestrian walkways of satisfactory width maintained or provided, and regularly inspected by the contractor
    Lighting:
    • Baulk timbers must be illuminated along their upper surfaces by red lights set at intervals no greater than 3 metres.
    • A hoarding that is on the carriageway – or is 45cm or less from the kerb face – shall be illuminated by red lights set at intervals no greater than 3 metres. The lights shall be positioned at a height of approximately 1.8 metres.
    • A hoarding which forms one side of a temporary walkway or one side of a stretch of unenclosed footway shall be illuminated by white lights set at intervals no greater than 3 metres.
    We note that all work stopped after we pointed out the requirements for lighting.......

    The critical issue of course is that there SHOULD be NO CONSTRUCTION OR DEVELOPMENT on this site UNTIL  the Construction Management Plan and ALL other pre-commencement planning conditions have been formally approved by the Council.

    We've received professional advice that to do otherwise would invalidate the Planning Permission which would, of course, mean it would have to be applied for all over again.

    The fact that the Construction Management Plan was REFUSED (see Decision Notice - REFUSED (8 June 2010) Delegated Report on reasons for refusal) means that it has to be formally resubmitted and consulted upon again.
    • We have some very scathing remarks to make about the inadequacies of the Construction Management Traffic Plan which was submitted AFTER the consultation period started for the last application.
    • We've also been talking with managers in the Health and Safety Executive's London Office this week and will be elaborating on the deficits in site traffic management on this construction site on a blog post next week.
    To date, there has been no resubmission of a Construction Management Plan.

    So nothing is going to be happening in terms of building of in Site 12 (or any of the other sites on the Eric & Treby Estate) any time soon.

    Thursday, 1 July 2010

    MERA Comments on Site Ecology Application

    The large mature Lime Tree not mentioned in the Habitat Survey 
    which crosses the boundary of Site 10 - above and beneath the ground

    Below you can find the summary of our comments in the covering letter to Mile End Residents Assocation's formal and detailed written response to PA/10/01121 - Approval of Details - Site ecology - pursuant to Condition 25 (Site Ecology) (ref the planning conditions relating to the permitted development on the Eric & Treby Estate ref: PA/09/2065)
    There are a number of problems with these proposals.

    The first problem is that yet again the Scheme Proposals appear to be incomplete as the Habitat Survey does not appear to have actually surveyed Site 10.  On this basis alone we feel the Scheme should be refused, revised and resubmitted AFTER Site 10 has been surveyed properly and precise recommendations developed for this site.

    Other concerns include:
    • there has been no survey of the lime tree at 648 Mile End Road which overhangs Site 10 re a number of matters eg no survey of nesting birds, no mapping of area of site 10 covered by roots of a healthy mature tree, how to deal with site contamination while protecting the root ball etc
    • much more precise recommendation are required re protection of the Lime Tree at 648 Mile End Road and its maintenance as a mature healthy tree given the need to also address the site contamination in the gardens of site 10
    • Site 10 needs to be surveyed for bat roosts. 
    • we'd like to see more specific proposals for planting trees in/around the site and Hamlets Way/Southern Grove
     Please note that we are using our website, (http://www.mile-end-residents.co.uk)  blog (http://meracouk.blogspot.com/) and Flickr account (http://www.flickr.com/photos/mile_end_residents/) for updates, comments and photographic records for the duration of the contract. 
    There is a significant amount of other documentation which still needs to be completed, submitted, consulted upon and addressed  (eg Construction Management Plan, Site Delivery and Services Plan, Landscaping strategy and management plan, refuse and recycling storage plan, energy efficiency scheme) we suggest there is plenty of time to remedy the deficits in terms of the surveys which have, as yet, not been conducted on Site 10.

    The report recommends:
    • a bat survey - the maisonettes at 1-14 Brokesley Street have been empty for some time and residents have seen bats in Brokesley Street in the past
    • a survey of nesting birds within the dense canopy of leaves.  
    Nesting birds are protected by law during the nesting season. 

    Wednesday, 30 June 2010

    MERA comments on Site Remediation Application (and more news!)

    Below you can find the summary of our comments in the covering letter to Mile End Residents Assocation's formal and detailed written response to PA/10/01093 - Approval of Details - Site Remediation (ref the planning conditions relating to the permitted development on the Eric & Treby Estate ref: PA/09/2065)
    We are becoming more and more concerned about what appears to be a sloppy approach to the developments of both plans to discharge the planning conditions and site practices.

    There are a number of problems with these proposals

    Scheme Proposals for investigation and remediation of site contamination are incomplete - they completely ignore site 10.  On this basis alone we feel the Scheme should be refused, revised and resubmitted.

    However other concerns include:
    • Site 3 has been "completed" and reopened without the recommended remediation works (ie no excavation of soil to an appropriate depth prior to replacement). 
    • The management of the Eric & Treby site also failed to inform other relevant agencies about the fact that Site 3 was being assessed for site contamination - contrary to recommended practice
    • Decontamination arrangements take no account of the dispersed nature of the various sites of soft landscaping where remedial works are required and make no provision for the protection of the public as the workers walk in their protective clothing across the estate to the area where they can clean up!
    • The traffic management plan is incorrect
    • Details of how noise will be suppressed are not as detailed as in the Construction Managament Plan
    Please note that we are using our website, (http://www.mile-end-residents.co.uk)  blog (http://meracouk.blogspot.com/) and Flickr account (http://www.flickr.com/photos/mile_end_residents/) for updates, comments and photographic records for the duration of the contract. 

    At present, we are noting almost daily breaches of acceptable practice for site management.  We will be seeking enforcement action in the near future if practices are not remedied immediately.
    We now wait to hear what is the response from Tower Hamlets Planning

    Site 2: Excavation of contaminated soil

    However we did think it might be sensible to include a couple of examples of what we mean by sloppy practices.

    Excavation of contamined soil on Site 2 (behind Coniston House)
    BEFORE this is a permitted development
    photo copyright MERA - some rights reserved.

    Just a few problems with the work to this contaminated site between Tony Cannell Mews and Coniston House!
    • soil has been excavated BEFORE this development has been permitted by Tower Hamlets Council.  Our response above is to the formal consultation on the proposed site remediation scheme scheme for dealing with the site contamination.  Until this has been agreed there can be no works on site as per the original planning permission.
    • It looks like somebody forgot to read the report from Herts and Essex Site Investigations.  They observed that the whole site is contaminated and that the soil under areas of soft landscaping need to be excavated to the recommended depth of 0.5 metres (20 inches.  The excavation did not reach the required depth of 20 inches before they started patting it down.  We estimate they have maybe excavated 5 inches - just 25% of what is required.
    • This is a contaminated site and yet there has been no communication with the residents round about.  Unsurprisingly they are very unhappy about being kept in the dark about what's going on.
    • We could see no hazard warnings or protective practices in evidence during the process of exposing this contaminated site.

    One of the requirements of the Site Remediation Scheme is that all excavation should be evidenced by photographs being taken of the measured depth of the excavation

    Just in case they forgot we thought we'd help out by taking a photograph for them!  We'll be forwarding this to planning with a link to this blog post as evidence of yet another breach of planning permission/conditions.  The kerb stones provide a neat scale for indicating depth.

    The trucks which have been on site have been engaged in all sorts of dangerous driving practices in addition to ignoring the Traffic Access Plan - which has yet to be approved.  This is what one of the MERA committee members  observed yesterday.
    Followed a construction truck out of Hamlets Way into Burdett Road this morning. I turn left down Bow Common Lane, and he was waiting in the right hand lane at the traffic lights, which is for straight on. He then decided he wanted to turn left, didn't pay any attention to me and cut me up, nearly crashing into my car despite my very angry horn honking!!! It was really dangerous and quite frightening too... he either didn't know I was there or didn't care! He then parked on Bow Common Lane near the bridge, which is also dangerous, as it is difficult to see oncoming cars when overtaking. Hopefully this is not an omen for the future!
    Response from the Head of Development Control

    In yesterday's blog post - Eric & Treby Site Traffic "out of control" - we said we were going to be asking Stephen Irvine "What exactly is the point of planning conditions if they are ignored and flouted on a daily basis? "

    Mark Taylor, Chair of Mile End Residents Association, wrote to Mr Irvine yesterday asking that question and highlighting the issues we are concerned about.

    We're very pleased to report that we received a very prompt, detailed and constructive response from Mr Irvine.  We look forward to the follow up action which was promised in the letter.

    More on this topic will be posted - watch this space!  (Meanwhile we'll keep watching the estate and construction site!)

    If you want to be kept updated why not subscribe - you can do this by clicking the link under the map and near the top of the right hand column and you will automatically receive an email copy of each blog post.

    Tuesday, 29 June 2010

    Eric & Treby Site Traffic "out of control"

    What exactly is the point of planning conditions if they are ignored and flouted on a daily basis?  That's the question MERA will be asking Stephen Irvine, Head of Development Control at Tower Hamlets Council.

    MERA's "spy in the sky" has an excellent view of all the SITE TRAFFIC on the Telford Homes development on Eastendhomes' Eric & Treby Estate.  

    The site traffic is giving our spy lots of practice at photographing and videoing.  The "spy in the sky"'s latest effort is a slideshow demonstrating how trucks regularly reverse without a banksman (see below).



    Note the pedestrian who is behind the truck as it starts to reverse without a banksman.

    Also note that this truck is removing contaminated soil from the site - an operation which is supposed to be strictly regulated to avoid creating health and safety issues for local residents.  We are not impressed with the operation to date.

    We're also photographing trucks

    1)  driving across the site with loads which have not been secured in any way - missing local residents' cars by very little. This is the dumper truck moving around site fencing - which was bouncing around within millimetres of residents' cars.  This is EXTREMELY UNSAFE.



    2)  driving the WRONG WAY up Southern Grove causing all sorts of problems for other traffic


    2)  exiting the site the wrong way - turning left into Southern Grove and exiting on to Mile End Road (A11) at a point not agreed with or approved by Transport for London for site traffic


    Today, the MERA Secretary today witnessed a cement truck employ a female passer-by as a "banksman" (the person who is qualified to supervise reversing trucks).

    MERA is currently thinking of starting a residents' sweepstake for how many incidents of breaches of the Traffic Access Management Plan it can log before the end of this contract!

    Except of course there is no approved Traffic Management Plan at the moment because the Construction Management Plan (which includes it) was REFUSED.

    Why was that?  Could it be because the details about site traffic management were so INADEQUATE?

    In the meantime, site traffic continues to behave as it pleases.......and we continue to photograph it.  We'll be sending copies to the relevant agencies who monitor health and safety on construction sites.

    In the meantime we'll be asking Mr Irvine exactly what is the point of planning conditions to protect the residents if they don't do anything of the sort.

    Plus we're also in correspondence with the Health & Safety Executive.

    Maybe our local councillors for Mile End East - who of course are also members of the Eastendhomes Board - would also like to follow up on this?